Please note that UNLV may not own the copyright to these materials and cannot provide permission to publish or distribute materials when UNLV is not the copyright holder. The user is solely responsible for determining the copyright status of materials and obtaining permission to use material from the copyright holder and for determining whether any permissions relating to any other rights are necessary for the intended use, and for obtaining all required permissions beyond that allowed by fair use.
Read more about our reproduction and use policy.
I agree.Information
Digital ID
Permalink
Details
More Info
Rights
Digital Provenance
Publisher
Transcription
V Time interval before filling pipe Pipe laid with cem-nt joints shall not he filled wicthi water until the lapse of 12 hours after the last joint in any valved section shall have been made, and pressure shall not be permitted in the pipe until all joints have aged—a minimum of 36 hours. Replacing defective joints If any joint is defective, it shall be cut out and entirely replaced at contractor's expense as directed by the Engineer. SETTING VALVES, VALVE BOXES, FITTINGS, AND BLOW-OFFS General Gate valves and pipe fittings shall be set and jointed to new pipe in the manner heretofore specified for cleaning, laying, end jointing pipe. PLUGGING DEAD ENDS Standard plugs shall be inserted into the bells of all dead ends of Pipes, tees, or crosses, and spigot ends shall be capped* »•&<, <f< ANCHORAGE OF PENDS, TEES, AND PLUGS Limiting Pipe Diameter and Degree of Bend Reaction or thrust backing shall be applied at all tees, plugs, caps and at bends deflecting 22-1/2 degrees or more, and at other locations as directed by the Engineer. Material for Reaction Backing Reaction or thrust backing shall be of concrete. Backing shall be placed between solid ground and the fitting to be atnchored; the area of bearing on pipe and on ground in each instance shall be that required by the Engineer. The backing shall, unless otherwise directed, be so placed that the pipe and fitting joints will be accessible for repair. HYDROSTATIC TESTS Pressure During Test After the pipe has been laid and partially backfilled, all newly laid pipe, or any valved section of it shall, unless otherwise specified., be subjected to hydrostatic pressure 50 per. cent above normal operating pressure. 7