Skip to main content

Search the Special Collections and Archives Portal

upr000097 22

Image

File
Download upr000097-022.tif (image/tiff; 23.68 MB)

Information

Digital ID

upr000097-022
    Details

    Rights

    This material is made available to facilitate private study, scholarship, or research. It may be protected by copyright, trademark, privacy, publicity rights, or other interests not owned by UNLV. Users are responsible for determining whether permissions are necessary from rights owners for any intended use and for obtaining all required permissions. Acknowledgement of the UNLV University Libraries is requested. For more information, please see the UNLV Special Collections policies on reproduction and use (https://www.library.unlv.edu/speccol/research_and_services/reproductions) or contact us at special.collections@unlv.edu.

    Digital Provenance

    Digitized materials: physical originals can be viewed in Special Collections and Archives reading room

    Publisher

    University of Nevada, Las Vegas. Libraries

    SPECIFICATIONS SO/^3 , Scope of liOrk. —--------T, '? The Contractor shall remove and replace so much ofJ the street and highway pavement as may be necessary; 'excavate : trenches and pits to reouired dimensions; excavate bell-holes; construct and maintain all bridges reouired for traffic con­trol; sheet, brace and support the adjoining ground or struc­tures where necessary; handle all drainage or ground x^ater; guard the site; unload, haul and distribute pipe, fittings and accessories which have not already been unloaded, hauled and distributed; lay and test pip®, fittings, valves and accessories; rearrange branch connections to main severs where necessary; rearrange other conduits, ducts, or pipes where necessary; re­place all damaged drains, severs, or other structures; chlorinate completed pipe line; backfill trench and pits; restore roadway surfaces; remove surplus excavated material; clean the site of .the work; and perform any other incidental x^ork reouired to provide a completed pipe line. Blocking Pipe The Contractor will not be permitted to support pipe, fittings or valves on blocking either temporarily or otherwise... Paving Permanent repaving over trench cuts shall be replaced by Contractor in accordance with specifications and to the satisfaction of State of Nevada Highway Department and City of Las Vegas. Inspection All pipe and accessories shall be laid, jointed, tested for defects and for leakage with pressure and chlorinated in the manner herein specified in the presence of the Engineer and subject to his approval. Contractor's Responsibility for Materials The Contractor's responsibility for material fur­nished by the Owner shall begin at the point of delivery by the Manufacturer, or Owner, and upon acceptance of the material by the Contractor. The Contractor shall be responsible for the safe storage of material furnished by or to him, and accepted by him, and intended for the work, until it has been incorporated ip the completed project. 1