Copyright & Fair-use Agreement
UNLV Special Collections provides copies of materials to facilitate private study, scholarship, or research. Material not in the public domain may be used according to fair use of copyrighted materials as defined by copyright law. Please cite us.
Please note that UNLV may not own the copyright to these materials and cannot provide permission to publish or distribute materials when UNLV is not the copyright holder. The user is solely responsible for determining the copyright status of materials and obtaining permission to use material from the copyright holder and for determining whether any permissions relating to any other rights are necessary for the intended use, and for obtaining all required permissions beyond that allowed by fair use.
Read more about our reproduction and use policy.
I agree.Information
Digital ID
Permalink
Details
More Info
Rights
Digital Provenance
Publisher
Transcription
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 Pacific, the District shall have the right to con* struct said pipe lines in locations shown by broken red and white lines between points narked A and V, V and K, Y and D, and K and E on said Exhibit "A-l”. Said pipe lines constructed along and across the property of the Union Pacific shall be constructed in accordance with good engineering practice, and the top of said pipe lines shall be at least three (3) feet below the surface of the ground* (b) Remove from the premises of the Union Pacific the 24-inch cast iron pipe line between points marked A and 1, the 16-inch transit© and cast iron pipe line between points marked A and K, and the pipe line between points marked R and HH shown in broken red and black lines on said Exhibit wA-ltt and restore the surface of the lands to the condition existing prior to such removal. (c) Remove the pumping station now located at point HH. The District shall have the right to relocate said pumping station in a new location shown in solid green square on Exhibit ’’A-l” near point R. Section it In the event the District shall not have commenced to construct the new pipe lines and removed the said existing pipe lines and pumping station as provided in Section 2 hereof with in two years from the sale date and shall not have completed said work within two (2) years and ten (10) months subsequent to the salje date, Union Pacific, after having given the District sixty (60) days - 5 -