Skip to main content

Search the Special Collections and Archives Portal

upr000095 60

Image

File
Download upr000095-060.tif (image/tiff; 26.72 MB)

Information

Digital ID

upr000095-060
    Details

    Rights

    This material is made available to facilitate private study, scholarship, or research. It may be protected by copyright, trademark, privacy, publicity rights, or other interests not owned by UNLV. Users are responsible for determining whether permissions are necessary from rights owners for any intended use and for obtaining all required permissions. Acknowledgement of the UNLV University Libraries is requested. For more information, please see the UNLV Special Collections policies on reproduction and use (https://www.library.unlv.edu/speccol/research_and_services/reproductions) or contact us at special.collections@unlv.edu.

    Digital Provenance

    Digitized materials: physical originals can be viewed in Special Collections and Archives reading room

    Publisher

    University of Nevada, Las Vegas. Libraries

    1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 Pacific, the District shall have the right to con* struct said pipe lines in locations shown by broken red and white lines between points narked A and V, V and K, Y and D, and K and E on said Exhibit "A-l”. Said pipe lines constructed along and across the property of the Union Pacific shall be constructed in accordance with good engineering practice, and the top of said pipe lines shall be at least three (3) feet below the surface of the ground* (b) Remove from the premises of the Union Pacific the 24-inch cast iron pipe line between points marked A and 1, the 16-inch transit© and cast iron pipe line between points marked A and K, and the pipe line between points marked R and HH shown in broken red and black lines on said Exhibit wA-ltt and restore the surface of the lands to the condition existing prior to such removal. (c) Remove the pumping station now located at point HH. The District shall have the right to relocate said pumping station in a new location shown in solid green square on Exhibit ’’A-l” near point R. Section it In the event the District shall not have com­menced to construct the new pipe lines and removed the said existing pipe lines and pumping station as provided in Section 2 hereof with in two years from the sale date and shall not have completed said work within two (2) years and ten (10) months subsequent to the salje date, Union Pacific, after having given the District sixty (60) days - 5 -