Skip to main content

Search the Special Collections and Archives Portal

upr000089 120

Image

File
Download upr000089-120.tif (image/tiff; 32.52 MB)

Information

Digital ID

upr000089-120
    Details

    Rights

    This material is made available to facilitate private study, scholarship, or research. It may be protected by copyright, trademark, privacy, publicity rights, or other interests not owned by UNLV. Users are responsible for determining whether permissions are necessary from rights owners for any intended use and for obtaining all required permissions. Acknowledgement of the UNLV University Libraries is requested. For more information, please see the UNLV Special Collections policies on reproduction and use (https://www.library.unlv.edu/speccol/research_and_services/reproductions) or contact us at special.collections@unlv.edu.

    Digital Provenance

    Digitized materials: physical originals can be viewed in Special Collections and Archives reading room

    Publisher

    University of Nevada, Las Vegas. Libraries

    1 tice, the same shall be constructed by Union Pacific of 39-inch cast iron or pipe of a similar character* x Said proposed pipe line shall be constructed in the location shown in broken red and white line between points marked ? and K on said Exhibit nknj (b) to construct a 24-inch pipe in the loca­tion shown in broken red and white line between points marked K and E on Exhibit nA* and an #-inch pipe line in location shown in broken red and white lines between points marked T and D on Exhibit nAn, it being understood that unless the parties can a-gree on the type of said 24-inch and S-inch pipe lines within ninety (90) days after such written notice, Union Pacific shall construct such pipe lines pursuant to good engineering practice and of the Approximate capacity hereinabove mentioned; (c) to relocate the pumping station now locat­ed at point HH to a new location shown in solid green square on Exhibit "A" near point R* The right to construct said pipe lines hereinabove referred to shall include the right to construct pumps, valves, connec­tions and appurtenances* It is mutually understood and agreed that the estimated cost of said pipe lines referred to in this section, including all appurtenances and the pumping station, is Three Hundred Thousand Dollars ($300,000.00). Section 3 . In the event the pumping station referred to in subparagraph (c) of Section 2 hereof shall be relocated as therein provided, Union Pacific, prior to such relocation, agrees to grant to the District by separate instrument a par­cel of land approximately 5,000 square feet in area for the construction of said relocated pumping station shown by green 3