Copyright & Fair-use Agreement
UNLV Special Collections provides copies of materials to facilitate private study, scholarship, or research. Material not in the public domain may be used according to fair use of copyrighted materials as defined by copyright law. Please cite us.
Please note that UNLV may not own the copyright to these materials and cannot provide permission to publish or distribute materials when UNLV is not the copyright holder. The user is solely responsible for determining the copyright status of materials and obtaining permission to use material from the copyright holder and for determining whether any permissions relating to any other rights are necessary for the intended use, and for obtaining all required permissions beyond that allowed by fair use.
Read more about our reproduction and use policy.
I agree.Information
Digital ID
Permalink
Details
More Info
Rights
Digital Provenance
Publisher
Transcription
1 tice, the same shall be constructed by Union Pacific of 39-inch cast iron or pipe of a similar character* x Said proposed pipe line shall be constructed in the location shown in broken red and white line between points marked ? and K on said Exhibit nknj (b) to construct a 24-inch pipe in the location shown in broken red and white line between points marked K and E on Exhibit nA* and an #-inch pipe line in location shown in broken red and white lines between points marked T and D on Exhibit nAn, it being understood that unless the parties can a-gree on the type of said 24-inch and S-inch pipe lines within ninety (90) days after such written notice, Union Pacific shall construct such pipe lines pursuant to good engineering practice and of the Approximate capacity hereinabove mentioned; (c) to relocate the pumping station now located at point HH to a new location shown in solid green square on Exhibit "A" near point R* The right to construct said pipe lines hereinabove referred to shall include the right to construct pumps, valves, connections and appurtenances* It is mutually understood and agreed that the estimated cost of said pipe lines referred to in this section, including all appurtenances and the pumping station, is Three Hundred Thousand Dollars ($300,000.00). Section 3 . In the event the pumping station referred to in subparagraph (c) of Section 2 hereof shall be relocated as therein provided, Union Pacific, prior to such relocation, agrees to grant to the District by separate instrument a parcel of land approximately 5,000 square feet in area for the construction of said relocated pumping station shown by green 3