Information
Digital ID
upr000050-110
UNLV Special Collections provides copies of materials to facilitate private study, scholarship, or research. Material not in the public domain may be used according to fair use of copyrighted materials as defined by copyright law. Please cite us.
Please note that UNLV may not own the copyright to these materials and cannot provide permission to publish or distribute materials when UNLV is not the copyright holder. The user is solely responsible for determining the copyright status of materials and obtaining permission to use material from the copyright holder and for determining whether any permissions relating to any other rights are necessary for the intended use, and for obtaining all required permissions beyond that allowed by fair use.
Read more about our reproduction and use policy.
I agree.Confirming owe phone conversation this after-* noon, regarding the isae of Caahmn’s ditcher for s t r a i t ening out th© laa ftg&a Oreaki I shoe? below a detailed estimate of coat of tasking a ®ow ditch bet/sen the Middle Spring and present bridge at Main Street; ; H - -'<PH H days ? itoohine rental .# $10*00 per day $120*00 I days labor @ 12.00 per d a y 72.00 6 days feel, oil k tools 10.00 per day 60.00 7 toys hand labor, turning creek into new'ditch and closing''off old ditch, ® $20*00 per day 140.00 Bstimted tot-.! . . « • • * • ^ 392.00 fhis estimate was compiled here in the office,• and is, of course, merely an estimate. Our figures are -based .on the Sartors Green ditcher excavating at an average depth of 3 feet, width 20 inches, and trenching approximately 1700 lineal feet per day. Above does not Include expense of engineers setting grade stakes or supervision expense* Tours truly.