Skip to main content

Search the Special Collections and Archives Portal

upr000050 110

Image

File
Download upr000050-110.tif (image/tiff; 23.93 MB)

Information

Digital ID

upr000050-110
    Details

    Rights

    This material is made available to facilitate private study, scholarship, or research. It may be protected by copyright, trademark, privacy, publicity rights, or other interests not owned by UNLV. Users are responsible for determining whether permissions are necessary from rights owners for any intended use and for obtaining all required permissions. Acknowledgement of the UNLV University Libraries is requested. For more information, please see the UNLV Special Collections policies on reproduction and use (https://www.library.unlv.edu/speccol/research_and_services/reproductions) or contact us at special.collections@unlv.edu.

    Digital Provenance

    Digitized materials: physical originals can be viewed in Special Collections and Archives reading room

    Publisher

    University of Nevada, Las Vegas. Libraries

    Confirming owe phone conversation this after-* noon, regarding the isae of Caahmn’s ditcher for s t r a i t ­ening out th© laa ftg&a Oreaki I shoe? below a detailed estimate of coat of tasking a ®ow ditch bet/sen the Middle Spring and present bridge at Main Street; ; H - -'<PH H days ? itoohine rental .# $10*00 per day $120*00 I days labor @ 12.00 per d a y 72.00 6 days feel, oil k tools 10.00 per day 60.00 7 toys hand labor, turning creek into new'ditch and closing''off old ditch, ® $20*00 per day 140.00 Bstimted tot-.! . . « • • * • ^ 392.00 fhis estimate was compiled here in the office,• and is, of course, merely an estimate. Our figures are -based .on the Sartors Green ditcher excavating at an aver­age depth of 3 feet, width 20 inches, and trenching ap­proximately 1700 lineal feet per day. Above does not Include expense of engineers setting grade stakes or sup­ervision expense* Tours truly.