Skip to main content

Search the Special Collections and Archives Portal

upr000033 60

Image

File
Download upr000033-060.tif (image/tiff; 23.24 MB)

Information

Digital ID

upr000033-060
    Details

    Rights

    This material is made available to facilitate private study, scholarship, or research. It may be protected by copyright, trademark, privacy, publicity rights, or other interests not owned by UNLV. Users are responsible for determining whether permissions are necessary from rights owners for any intended use and for obtaining all required permissions. Acknowledgement of the UNLV University Libraries is requested. For more information, please see the UNLV Special Collections policies on reproduction and use (https://www.library.unlv.edu/speccol/research_and_services/reproductions) or contact us at special.collections@unlv.edu.

    Digital Provenance

    Digitized materials: physical originals can be viewed in Special Collections and Archives reading room

    Publisher

    University of Nevada, Las Vegas. Libraries

    Mr. Frank Strongs Confirming our conversation today with reference to proposed Installation of a sewer main to serve our property and that of Sears- Roebuok on North Main Street, authorized under W0-601S The plan originally proposed to start this sewer line 750 feet north of the main sewer transmission line and run southerly to a connection therewith would involve about 13 feet of excavation at the south end, and test holes indicated rook at five feet. It is suggested that the sewer line be run northerly, following the contour of the ground, cross North,Main Street at Washington and connect with the existing 8-inch sewer main in the alley east of Main Street. Have conferred with City Engineer, who offers no objection, and we anticipate no difficulty in receiving permission of the State Highway Department to cross North Main Street. Confirming telephone conversation with Mr. Maag today, will you please have Engineer Plrie run levels for this proposed new design when he has finished the Job he is now working on. While this proposed new design will involve about another 2 5 0 feet, it appears it will be more economical because the maximum excavation will be about b feet Las Vegas - May 21, 19^8 W 1-1-2-B A. M. Folger