Information
Digital ID
upr000031-110
UNLV Special Collections provides copies of materials to facilitate private study, scholarship, or research. Material not in the public domain may be used according to fair use of copyrighted materials as defined by copyright law. Please cite us.
Please note that UNLV may not own the copyright to these materials and cannot provide permission to publish or distribute materials when UNLV is not the copyright holder. The user is solely responsible for determining the copyright status of materials and obtaining permission to use material from the copyright holder and for determining whether any permissions relating to any other rights are necessary for the intended use, and for obtaining all required permissions beyond that allowed by fair use.
Read more about our reproduction and use policy.
I agree.When c Oils traction of two or more buildings shall hay© been started In an area not provided with sewer facilities the subdivider shall start construction of a sewer lateral from an exist ant manhole or a point designated by the City Engineer and complete the line to the next manhole within thirty days* There shall be a standard manhole at the end of each lateral* at all points at which the seller changes grade* and at all points at which the seirer changes alignment| All sewer laterals shall be of vitrified tile not less than eight inches In diameter,, The subdivider shall provide the City Engineer with two plats of his' subdivision to a scale of two hundred feet to the inch on which the proposed location of all laterals and manholes are designated. These plats shall also designate the length and grad© of all sewer laterals. If satisfactory one plat will be ©keyed by the City Engineer and returned to the subdivider the other plat to b© retained for th© City files.