Skip to main content

Search the Special Collections and Archives Portal

upr000031 110

Image

File
Download upr000031-110.tif (image/tiff; 47.71 MB)

Information

Digital ID

upr000031-110
    Details

    Rights

    This material is made available to facilitate private study, scholarship, or research. It may be protected by copyright, trademark, privacy, publicity rights, or other interests not owned by UNLV. Users are responsible for determining whether permissions are necessary from rights owners for any intended use and for obtaining all required permissions. Acknowledgement of the UNLV University Libraries is requested. For more information, please see the UNLV Special Collections policies on reproduction and use (https://www.library.unlv.edu/speccol/research_and_services/reproductions) or contact us at special.collections@unlv.edu.

    Digital Provenance

    Digitized materials: physical originals can be viewed in Special Collections and Archives reading room

    Publisher

    University of Nevada, Las Vegas. Libraries

    When c Oils traction of two or more buildings shall hay© been started In an area not provided with sewer facilities the subdivider shall start construction of a sewer lateral from an exist ant manhole or a point designated by the City Engineer and complete the line to the next manhole within thirty days* There shall be a standard manhole at the end of each lateral* at all points at which the seller changes grade* and at all points at which the seirer changes alignment| All sewer laterals shall be of vitrified tile not less than eight inches In diameter,, The subdivider shall provide the City Engineer with two plats of his' subdivision to a scale of two hundred feet to the inch on which the proposed location of all laterals and manholes are designated. These plats shall also designate the length and grad© of all sewer laterals. If satisfactory one plat will be ©keyed by the City Engineer and returned to the subdivider the other plat to b© retained for th© City files.