Copyright & Fair-use Agreement
UNLV Special Collections provides copies of materials to facilitate private study, scholarship, or research. Material not in the public domain may be used according to fair use of copyrighted materials as defined by copyright law. Please cite us.
Please note that UNLV may not own the copyright to these materials and cannot provide permission to publish or distribute materials when UNLV is not the copyright holder. The user is solely responsible for determining the copyright status of materials and obtaining permission to use material from the copyright holder and for determining whether any permissions relating to any other rights are necessary for the intended use, and for obtaining all required permissions beyond that allowed by fair use.
Read more about our reproduction and use policy.
I agree.Information
Digital ID
Permalink
Details
Member of
More Info
Rights
Digital Provenance
Publisher
Transcription
Estimate of cost of a five-room cottage at Las Tegas, levada. elevations similar to design I©. 2, drawing Ho. of 6” concrete blocks, and "Ready Rock” roofing. 15574; exterior walls Description Material Labor Total Excavation (House, fence posts, etc)9cy@$*40 3*60 3.60 Concrete foundation, 9 1/2 c.y. 8.00 33.25 42.75 76.00 Chimney on "brackets, 10 lin. ft. 1.20 7.50 4.50 12.00 Exterior walls, 6” cone, blocks,1056s.f. .195 71.28 134.64 205.92 Rough lumber, 4,350* B.M. 34.00 82.65 65.25 147.90 Flo oring 1,150 * B. M. 43.00 32.20 17.25 49.45 "Ready Rock” roofing, 14 squares 3.30 32.20 14.00 46.20 Finish lumber, 700* B.M. 55.00 28.00 10.50 38.50 Ceiling, 425* B.M. 45 .'00 12.75 6.37 19.12 Moulding, 350 lin. ft. .04 7.00 7.00 14.00 n 325 n « .015 2.44 2.43 4.87 Base, l”x8”, 325 lin. ft. .12 19.50 19.50 39.00 Windows&Frames,6 2Xts« 3*04*x4*6”xl 1/2”) ' ?- 3 S ” 2*6”3:3,0”xl l/2”)7.50 45.00 22.50 67.50 ” 12” 3*6”x4*6”xl 1/2” 8.50 6.00 2.50 8.50 Window screens for lower sash, 10 .60 4.50 1.50 6.00 Doors and frames (Interior), 10 7.00 47.50 22.50 70.00 ” « n (Front). 1 12.00 8.75 3.25 12.00 ” ” ” (Screen), 2 2.00 3.25 .75 4.00 Porch screen, 60 sq. ft. .05 1.80 1.20 3.00 Kitchen cupboard 17.50 7.50 25.00 Hardware 54.00 54.00 Plastering, 350 sq. yds. .25 29.75 57.75 87.50 Painting, 231 ” ” .20 18.48 27.72 46.20 Plumbing 110.00 35.00 145.00 Board fence (Side & rear) 1126* B.I [. 34.00 21.39 16.89 38.28 Iron fence (Front & side) 65 lin. ft* .35 16.25 6.50 22.75 Cement walk 24*x$T, 3” thick, 72 sq.ft. .10 2.16 5.04 7.20 Electric lights(Single drop Its.) 9 outlets 2.50 12.50 10.00 22.50 Electric lights(2 light fixtures) 1 outlet 5.00 4.50 • 50 5.00 Cast iron ventilator plates,6”xl2” 6 per doss.3.50 1.75 1#75 10^ supervision & contingencies 73.38 54.88 128.26 Total estimated cost less freight t >807 • 23 $603.77 $ 1411.00 Freight at commercial rate 190.00 190.00 Total estimated cost plus freight at commercial rates $997.23 $605.77 $1601.00 Los Angeles, Cal., July 1, 19 09.