Skip to main content

Search the Special Collections and Archives Portal

upr000018 214

Image

File
Download upr000018-214.tif (image/tiff; 26.49 MB)

Information

Digital ID

upr000018-214
Details

Member of

Rights

This material is made available to facilitate private study, scholarship, or research. It may be protected by copyright, trademark, privacy, publicity rights, or other interests not owned by UNLV. Users are responsible for determining whether permissions are necessary from rights owners for any intended use and for obtaining all required permissions. Acknowledgement of the UNLV University Libraries is requested. For more information, please see the UNLV Special Collections policies on reproduction and use (https://www.library.unlv.edu/speccol/research_and_services/reproductions) or contact us at special.collections@unlv.edu.

Digital Provenance

Digitized materials: physical originals can be viewed in Special Collections and Archives reading room

Publisher

University of Nevada, Las Vegas. Libraries

Estimate of cost of a five-room cottage at Las Tegas, levada. elevations similar to design I©. 2, drawing Ho. of 6” concrete blocks, and "Ready Rock” roofing. 15574; exterior walls Description Material Labor Total Excavation (House, fence posts, etc)9cy@$*40 3*60 3.60 Concrete foundation, 9 1/2 c.y. 8.00 33.25 42.75 76.00 Chimney on "brackets, 10 lin. ft. 1.20 7.50 4.50 12.00 Exterior walls, 6” cone, blocks,1056s.f. .195 71.28 134.64 205.92 Rough lumber, 4,350* B.M. 34.00 82.65 65.25 147.90 Flo oring 1,150 * B. M. 43.00 32.20 17.25 49.45 "Ready Rock” roofing, 14 squares 3.30 32.20 14.00 46.20 Finish lumber, 700* B.M. 55.00 28.00 10.50 38.50 Ceiling, 425* B.M. 45 .'00 12.75 6.37 19.12 Moulding, 350 lin. ft. .04 7.00 7.00 14.00 n 325 n « .015 2.44 2.43 4.87 Base, l”x8”, 325 lin. ft. .12 19.50 19.50 39.00 Windows&Frames,6 2Xts« 3*04*x4*6”xl 1/2”) ' ?- 3 S ” 2*6”3:3,0”xl l/2”)7.50 45.00 22.50 67.50 ” 12” 3*6”x4*6”xl 1/2” 8.50 6.00 2.50 8.50 Window screens for lower sash, 10 .60 4.50 1.50 6.00 Doors and frames (Interior), 10 7.00 47.50 22.50 70.00 ” « n (Front). 1 12.00 8.75 3.25 12.00 ” ” ” (Screen), 2 2.00 3.25 .75 4.00 Porch screen, 60 sq. ft. .05 1.80 1.20 3.00 Kitchen cupboard 17.50 7.50 25.00 Hardware 54.00 54.00 Plastering, 350 sq. yds. .25 29.75 57.75 87.50 Painting, 231 ” ” .20 18.48 27.72 46.20 Plumbing 110.00 35.00 145.00 Board fence (Side & rear) 1126* B.I [. 34.00 21.39 16.89 38.28 Iron fence (Front & side) 65 lin. ft* .35 16.25 6.50 22.75 Cement walk 24*x$T, 3” thick, 72 sq.ft. .10 2.16 5.04 7.20 Electric lights(Single drop Its.) 9 outlets 2.50 12.50 10.00 22.50 Electric lights(2 light fixtures) 1 outlet 5.00 4.50 • 50 5.00 Cast iron ventilator plates,6”xl2” 6 per doss.3.50 1.75 1#75 10^ supervision & contingencies 73.38 54.88 128.26 Total estimated cost less freight t >807 • 23 $603.77 $ 1411.00 Freight at commercial rate 190.00 190.00 Total estimated cost plus freight at commercial rates $997.23 $605.77 $1601.00 Los Angeles, Cal., July 1, 19 09.