Information
Digital ID
upr000001-068
UNLV Special Collections provides copies of materials to facilitate private study, scholarship, or research. Material not in the public domain may be used according to fair use of copyrighted materials as defined by copyright law. Please cite us.
Please note that UNLV may not own the copyright to these materials and cannot provide permission to publish or distribute materials when UNLV is not the copyright holder. The user is solely responsible for determining the copyright status of materials and obtaining permission to use material from the copyright holder and for determining whether any permissions relating to any other rights are necessary for the intended use, and for obtaining all required permissions beyond that allowed by fair use.
Read more about our reproduction and use policy.
I agree.r m June 15, 19 IS. V • Hiatt General Maaasrar* Dear Sir: I have your joint favor of Juno 14th in the matter of water supply pipe line at Lag Vegas, and enclosing bids covering concrete pipe line, also machine banded redwood pipe; and note that the concrete pip© people now give guarantee of five years, and that a concroto pipe line would cost about $11,000 less than the wooden pipe# only about f§§ on the cost of renewing the pipe line, and I agree with you that so long as the repairs are so nominal the work can that when the repair expenses increase to such a point as to reach 5 or 6% on the cost of new line that we renew the line with 18” concrete pipe under five years guarantee. I also note that the present cost of repairs amounts to bo deferred However, if Mr. Bancroft concurs, X recommend Very truly yours (Signed) MHOBS QJtAMK 00- I-.tr. VT. H. Bancroft.