Skip to main content

Search the Special Collections and Archives Portal

upr000001 68

Image

File
Download upr000001-068.tif (image/tiff; 101.1 MB)

Information

Digital ID

upr000001-068
    Details

    Rights

    This material is made available to facilitate private study, scholarship, or research. It may be protected by copyright, trademark, privacy, publicity rights, or other interests not owned by UNLV. Users are responsible for determining whether permissions are necessary from rights owners for any intended use and for obtaining all required permissions. Acknowledgement of the UNLV University Libraries is requested. For more information, please see the UNLV Special Collections policies on reproduction and use (https://www.library.unlv.edu/speccol/research_and_services/reproductions) or contact us at special.collections@unlv.edu.

    Digital Provenance

    Digitized materials: physical originals can be viewed in Special Collections and Archives reading room

    Publisher

    University of Nevada, Las Vegas. Libraries

    r m June 15, 19 IS. V • Hiatt General Maaasrar* Dear Sir: I have your joint favor of Juno 14th in the matter of water supply pipe line at Lag Vegas, and enclosing bids covering concrete pipe line, also machine banded redwood pipe; and note that the concrete pip© people now give guarantee of five years, and that a concroto pipe line would cost about $11,000 less than the wooden pipe# only about f§§ on the cost of renewing the pipe line, and I agree with you that so long as the repairs are so nominal the work can that when the repair expenses increase to such a point as to reach 5 or 6% on the cost of new line that we renew the line with 18” concrete pipe under five years guarantee. I also note that the present cost of repairs amounts to bo deferred However, if Mr. Bancroft concurs, X recommend Very truly yours (Signed) MHOBS QJtAMK 00- I-.tr. VT. H. Bancroft.