Copyright & Fair-use Agreement
UNLV Special Collections provides copies of materials to facilitate private study, scholarship, or research. Material not in the public domain may be used according to fair use of copyrighted materials as defined by copyright law. Please cite us.
Please note that UNLV may not own the copyright to these materials and cannot provide permission to publish or distribute materials when UNLV is not the copyright holder. The user is solely responsible for determining the copyright status of materials and obtaining permission to use material from the copyright holder and for determining whether any permissions relating to any other rights are necessary for the intended use, and for obtaining all required permissions beyond that allowed by fair use.
Read more about our reproduction and use policy.
I agree.Information
Digital ID
Permalink
Details
More Info
Rights
Digital Provenance
Publisher
Transcription
ij&s Vegas Valley Water District Differences Between Aixsouats Compiled on Schedule A and Montgomery Report for the Period From January 1, 1951 to September 1, 1952 MPoangteg Noome0 royf Report Detalle -- 4 Mo and Lo for installation of two pressure*>redueing valves near 21st and Stewart 4 4 5 9 9 6 6 6 7 7 8 8 Tn«+.*n connection in Stewart near Bruce to serve area south of Steuart (addition to W/0 640) Construct additional B” main required by City in St* Louis Avenue W/0 678 - 8" CIP » « 6" CIP Total W/0 678 Per Montgomery Report TpgfcaTi, Punp and Motor on Wells Bs 10 & 11 300,000 galo tank etc0 - Schedule A«4 $136,622*00 Per Montgomery Report 127.600.00 W/0 674 - 6" CIP $ 88*26 ? - 8" CIP 6,050o31 It -10" CIP 12,536*56 « -12" CIP 7,467*60 ? -14" CIP Total w/0 674 r s M Per Montgomery Report 600*52 W/0 684 - 6" CIP $ 2,448o65 Per Montgomery Report W/0 685 - 6" CIP $ 3,760*78 " « 8" CIP F^7S8*88 PerT Mootnatlg Wo/me0r 6y8 R5eport 62*04 W/0 696 - Included in Montgomery Report, this W/0 completed after 9/1/52 and included in additions to basic purchase price at 6/30/54 Construct Mains « Columbia Hgts* - Canceled Construct Mains — Columbia Hgts0 — Canceled W/0* 653 -=» 68"" CCIIPP PerT Mootnatlg Wo/m0e r6y5 R3e port Amount 2,302*67 238o64 732o39 (5,994o31) 2,625o45 (9,022o00) (26,246o99) (980o38) (5,706o84) 9,694o82 6,320o00 6,460o00 (1,213o60) Total Differences * ( 20,790*15)