Skip to main content

Search the Special Collections and Archives Portal

man000213 8

Image

File
Download man000213-008.tif (image/tiff; 27.32 MB)

Information

Digital ID

man000213-008
    Details

    Rights

    This material is made available to facilitate private study, scholarship, or research. It may be protected by copyright, trademark, privacy, publicity rights, or other interests not owned by UNLV. Users are responsible for determining whether permissions are necessary from rights owners for any intended use and for obtaining all required permissions. Acknowledgement of the UNLV University Libraries is requested. For more information, please see the UNLV Special Collections policies on reproduction and use (https://www.library.unlv.edu/speccol/research_and_services/reproductions) or contact us at special.collections@unlv.edu.

    Digital Provenance

    Digitized materials: physical originals can be viewed in Special Collections and Archives reading room

    Publisher

    University of Nevada, Las Vegas. Libraries

    ij&s Vegas Valley Water District Differences Between Aixsouats Compiled on Schedule A and Montgomery Report for the Period From January 1, 1951 to September 1, 1952 MPoangteg Noome0 royf Report Detalle -- 4 Mo and Lo for installation of two pressure*>redueing valves near 21st and Stewart 4 4 5 9 9 6 6 6 7 7 8 8 Tn«+.*n connection in Stewart near Bruce to serve area south of Steuart (addition to W/0 640) Construct additional B” main required by City in St* Louis Avenue W/0 678 - 8" CIP » « 6" CIP Total W/0 678 Per Montgomery Report TpgfcaTi, Punp and Motor on Wells Bs 10 & 11 300,000 galo tank etc0 - Schedule A«4 $136,622*00 Per Montgomery Report 127.600.00 W/0 674 - 6" CIP $ 88*26 ? - 8" CIP 6,050o31 It -10" CIP 12,536*56 « -12" CIP 7,467*60 ? -14" CIP Total w/0 674 r s M Per Montgomery Report 600*52 W/0 684 - 6" CIP $ 2,448o65 Per Montgomery Report W/0 685 - 6" CIP $ 3,760*78 " « 8" CIP F^7S8*88 PerT Mootnatlg Wo/me0r 6y8 R5eport 62*04 W/0 696 - Included in Montgomery Report, this W/0 completed after 9/1/52 and included in additions to basic purchase price at 6/30/54 Construct Mains « Columbia Hgts* - Canceled Construct Mains — Columbia Hgts0 — Canceled W/0* 653 -=» 68"" CCIIPP PerT Mootnatlg Wo/m0e r6y5 R3e port Amount 2,302*67 238o64 732o39 (5,994o31) 2,625o45 (9,022o00) (26,246o99) (980o38) (5,706o84) 9,694o82 6,320o00 6,460o00 (1,213o60) Total Differences * ( 20,790*15)