Skip to main content

Search the Special Collections and Archives Portal

man000205 45

Image

File
Download man000205-045.tif (image/tiff; 26.85 MB)

Information

Digital ID

man000205-045
    Details

    Rights

    This material is made available to facilitate private study, scholarship, or research. It may be protected by copyright, trademark, privacy, publicity rights, or other interests not owned by UNLV. Users are responsible for determining whether permissions are necessary from rights owners for any intended use and for obtaining all required permissions. Acknowledgement of the UNLV University Libraries is requested. For more information, please see the UNLV Special Collections policies on reproduction and use (https://www.library.unlv.edu/speccol/research_and_services/reproductions) or contact us at special.collections@unlv.edu.

    Digital Provenance

    Digitized materials: physical originals can be viewed in Special Collections and Archives reading room

    Publisher

    University of Nevada, Las Vegas. Libraries

    1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 right t© construct said new p p i lines referred to in this Section IT shall include the right t© construct pumps, values, connections and appurtenances. Section 18. In the event the District and Railroad Companies are able to agree upon the type and nature of the pipe lines and pacing stations to be constructed by the Railroad Companies pursuant to the provisions of Section IT hereof, said new pip® lines, appurtenances and pumping station shall 'be con­strue ted, and said pipe lines shown by broken black and red line on Exhibit “A” shall be removed, under the loint direction of the District and Railroad Companies pursuant to a contract to be entered into between the Railroad Companies and a contractor after bids have been obtained therefor. In the event the Railroad Companies and District shall fee unable to agree upon the type and nature of said new pipe lines and pumping station, Railroad Companies shall nevertheless have the right to construct said facilities as provided in Section If and to remove said pipe lines shown by broken black and red lines on Exhibit •g* pursuant to a contract to be entered into between the Railroad Companies and a contractor after bids have been obtained therefor. In either event the contract price thereof plus 1 0 for supervision shall foe considered as the cost te Railroad Companies ©f con­structing said new pipe line facilities and pumping station and removing said existing pipe lines. Section W . In the event the pumping station referred to in subparagraph {©} of sectlone 16 and 1? hereof shall be re- ? 37