Skip to main content

Search the Special Collections and Archives Portal

man000174 30

Image

File
Download man000174-030.tif (image/tiff; 27.62 MB)

Information

Digital ID

man000174-030
    Details

    Rights

    This material is made available to facilitate private study, scholarship, or research. It may be protected by copyright, trademark, privacy, publicity rights, or other interests not owned by UNLV. Users are responsible for determining whether permissions are necessary from rights owners for any intended use and for obtaining all required permissions. Acknowledgement of the UNLV University Libraries is requested. For more information, please see the UNLV Special Collections policies on reproduction and use (https://www.library.unlv.edu/speccol/research_and_services/reproductions) or contact us at special.collections@unlv.edu.

    Digital Provenance

    Digitized materials: physical originals can be viewed in Special Collections and Archives reading room

    Publisher

    University of Nevada, Las Vegas. Libraries

    1 2 3 4 5 6 7' 8 QZJ 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 lines referrsd to in subparagraphs (e) axtd (d) of this section witty la tut period i M Mentioned, the Paisa Pacific shall tttttn the right to ftsovft » M wire linos and to construct, or arrange with the Southern Nevada Power Coapaay for the construction ©f, new con nsellens between the existing power facilities of the- District eng the power lines of the Southern Sereda Power Coapsny so as to pro­vide power for the operation of the water production facilities lo­cated upon the lend shewn tinted in pink on Sxhihlt ’*1~1*. Tim Railroad Company shall have the right to eonstruet sush facilities upon the property of the District as shall he neoe* sary to oeimset said new pipe lin* and new power line connection* into the existing facilities of the District. Upon the completion of said work the District shall pay to ths Railroad Company, within thirty (30) days after renditim of hill therefor, the actual cost to M o n Pacific and the Southern Nevada Power Company of removing said pipe lines and wire lines and constructing said new pipe line and said new power line connectiona plus tea per cent (10$) of said actual cost of construction representing the cost of s upervision. Section |i the District agrees that it will, at its sole cost and expease, and within two years from the sale M e , a«awea#e and thereafter diligently prosecute te eospletion the following war (a) Construct adequate pipe linee to replace the pipe linee. referred to in eubpersgreph (h) of this ssstlen, wfeich ere to he removed hy the District. In the event the District deeires to construct said pipe lines along and across the property of M o n