Copyright & Fair-use Agreement
UNLV Special Collections provides copies of materials to facilitate private study, scholarship, or research. Material not in the public domain may be used according to fair use of copyrighted materials as defined by copyright law. Please cite us.
Please note that UNLV may not own the copyright to these materials and cannot provide permission to publish or distribute materials when UNLV is not the copyright holder. The user is solely responsible for determining the copyright status of materials and obtaining permission to use material from the copyright holder and for determining whether any permissions relating to any other rights are necessary for the intended use, and for obtaining all required permissions beyond that allowed by fair use.
Read more about our reproduction and use policy.
I agree.Information
Digital ID
Permalink
Details
More Info
Rights
Digital Provenance
Publisher
Transcription
1 2 3 4 5 6 7' 8 QZJ 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 lines referrsd to in subparagraphs (e) axtd (d) of this section witty la tut period i M Mentioned, the Paisa Pacific shall tttttn the right to ftsovft » M wire linos and to construct, or arrange with the Southern Nevada Power Coapaay for the construction ©f, new con nsellens between the existing power facilities of the- District eng the power lines of the Southern Sereda Power Coapsny so as to provide power for the operation of the water production facilities located upon the lend shewn tinted in pink on Sxhihlt ’*1~1*. Tim Railroad Company shall have the right to eonstruet sush facilities upon the property of the District as shall he neoe* sary to oeimset said new pipe lin* and new power line connection* into the existing facilities of the District. Upon the completion of said work the District shall pay to ths Railroad Company, within thirty (30) days after renditim of hill therefor, the actual cost to M o n Pacific and the Southern Nevada Power Company of removing said pipe lines and wire lines and constructing said new pipe line and said new power line connectiona plus tea per cent (10$) of said actual cost of construction representing the cost of s upervision. Section |i the District agrees that it will, at its sole cost and expease, and within two years from the sale M e , a«awea#e and thereafter diligently prosecute te eospletion the following war (a) Construct adequate pipe linee to replace the pipe linee. referred to in eubpersgreph (h) of this ssstlen, wfeich ere to he removed hy the District. In the event the District deeires to construct said pipe lines along and across the property of M o n