Archival objects in this container: Aerial view, southwest, showing present construction condition of sewage disposal plant Note cell units (upper right): photographic print, 1942 September 23 Oxide plant: Gabbs Valley, Nevada: photographic print, 1942 June 01 Aerial view, west, showing grading of grounds for landscaping at hospital: photographic print, 1942 September 23 Aerial view, northwest, chlorine area, showing cell buildings 1 and 2, liquefaction buildings 1and 2, cell renewal and concrete parts buildings, and brine system: photographic print, 1942 September 23 Aerial view, south, of preparation area, showing preparation buildings B-1 and B-2 and supporting structures cell units No. 1, No. 2, No. 3 (upper center): photographic print, 1942 September 23 Aerial view, northwest, neutralization area, showing installation of equipment in thickener tanks and steel erection of neutralization building: photographic print, 1942 September 23 Aerial view, west, showing washery sections and ingot casting portions of refinery buildings J-1 and J-2. Note main water cooling tower, upper center: photographic print, 1942 September 23 Aerial view, west, showing construction progress on metal producing portion of plant: photographic print, 1942 September 23 Aerial view, west, showing construction progress on metal producing portion of plant: photographic slide, 1942 September 23 Aerial view, west, showing completed exterior of Basic Town site school: photographic print, 1942 September 23 Aerial view, west, showing completed exterior of Basic Town site school: photographic slide, 1942 September 23 Aerial view, southwest, women's apartments, showing erection of studs and general layout: photographic print, 1942 September 23 Northwest view, preparation Buildings B-1 and B-2, showing installation of APM siding: photographic print, 1942 September 17 South view, showing bases for 40,000 gallon acid storage tanks, erection of steel for neutralization building and magnesite silos: photographic print, 1942 September 17 Showing installation of agitator mechanism in clariflocculator No. 2 in neutralization area, neutralization building structural steel in the foreground: photographic print, 1942 September 17 West view, recovery buildings 1-A, B, showing installation of clarifier tank (1-A) and tank footings (1-B): photographic print, 1942 September 17 Construction progress of women's dormitory, showing erection of side walls and installation of plumbing: photographic print, 1942 September 17 Construction progress of elementary school and auditorium in Basic Town site: photographic print, 1942 September 17 Northeast view, preparation Building B-2, showing erection of transfer conveyor and head house and temporary system now in use: photographic print, 1942 September 16 Looking north to cell units No. 9 and No. 10, and showing installation of 54 inch storm drain down 15th Street: photographic print, 1942 September 16 East view, pellet storage building showing stripping of side wall forms: photographic print, 1942 September 16 North view, foundry buildings J-1 and J-2, showing construction of wall forms, and backfill completed in washery sections: photographic print, 1942 September 16 Aerial view, northwest, chlorine area, showing cell buildings No. 1 and No. 2, liquefaction and cell renewal buildings, brine system and boiler house: photographic print, 1942 September 08 Aerial view, northwest, preparation area, showing pellet storage building, prep Buildings B-1 and B-2, magnesium chloride tanks, salt, coal, peat, and magnesite buildings: photographic print, 1942 September 08 Aerial view, north, neutralization area, showing thickeners, clariflocculators, magnesite silos main water cooling tower (right background): photographic print, 1942 September 08 Load More