Archival objects in this container: East side of cell building No. 2, showing hydrogen-brine and cell liquor piping: photographic print, 1942 June 08 West side of cell building No. 2, showing hydrogen-brine and cell liquor piping and erection of structural steel: photographic print, 1942 June 08 Cell unit No. 6 showing electrolysis portion (left) and erection of party wall steel of chlorinator building (right): photographic print, 1942 June 06 Chlorinator portion of cell unit No. 5, showing erection of steel and installation of wash towers: photographic print, 1942 June 06 South view of cell unit No. 2, showing progress of steel erection and installation of wash towers: photographic print, 1942 June 06 Northeast view of cell unit No. 1, showing building (left), electrolysis building (center) and chlorinator building far right: photographic print, 1942 June 06 Southwest view of chlorinator building No. 1, showing construction progress and installation of APM roofing: photographic print, 1942 June 04 Installation of conveyor system to raw brine storage tanks: photographic print, 1942 June 04 Construction progress of salt storage and handling building, showing erection of structural steel on concrete park: photographic print, 1942 June 04 Showing erection of wood roof trusses on primary peat storage buildings No. 1: photographic print, 1942 June 04 Construction progress of thickener tanks in neutralizing plant, showing wall forms and reinforcing steel in place: photographic print, 1942 June 04 Northwest view of preparation building, showing steel erection of tunnel kiln and rotary kiln sections Note completed magnesium tanks (left): photographic print, 1942 June 04 Interior view, cell building No. 1, showing installation of hooker type "S" chlorine cells: photographic print, 1942 May 29 Cell renewal building, showing cell plates being removed from lead molder: photographic print, 1942 May 29 Interior view of cell renewal building showing cell plates in chlorine cell, ready for lead pouring: photographic print, 1942 May 29 Interior first floor view of chlorinator unit No. 1, showing masonry progress at base of chlorinator furnace shells: photographic print, 1942 May 29 Showing installation of rectifier units in cell building No. 1: photographic print, 1942 May 29 Construction progress of preparation plant salt storage and handling building Note peat storage and drying beds in background: photographic print, 1942 May 27 Southeast view of cell units, showing construction progress of units No. 5, 6, 7, 8: photographic print, 1942 May 27 Northeast view of preparation plant, showing steel erection on rotary kiln and tunnel kiln buildings: photographic print, 1942 May 27 Northwest view of primary peat storage buildings No. 1 and No. 2, showing erection of roof members: photographic print, 1942 May 27 Southeast view of cell building No. 1, showing transformer installation: photographic print, 1942 May 27 Aerial view, southeast, of trailer and construction boarding camps Note installation of utilities in trailer camp area: photographic print, 1942 May 19 Aerial view, south, showing temporary administration and construction buildings, with demountable city in background: photographic print, 1942 May 19 Aerial view, east, of preparation area, showing primary peat storage buildings, storage silos, coal storage, salt storage, and preparation buildings: photographic print, 1942 May 19 Load More