Archival objects in this container: Screw: rudder, elevator aileron tab locking, 1944 July 01 Head: control column casting, 1943 June 16 Support assembly control system, 1944 January 29 Perspective: power controls elevator, 1949 June 21 Jack screw assembly: aileron artificial feel system, 1950 August 10 Layout: elevator tab hydraulic change-over mechanics, 1943 October 20 Sector assembly: flight deck flying tab, 1943 September 30 Rudder pedal assembly, 1943 June 30 Control column assembly, 1943 June 25 Perspective installation - rudder controls complete, 1943 June 25 Layout: control column; base and mounting bracket, 1943 November 20 Perspective installation - elevator controls complete, 1948 February 25 Final assembly, 1946 July 12 Installation: rudder pedals, 1944 January 17