Archival objects in this container: Annual Report 1987 - Stripa Project 88-06, 1988 June Site Characterization and Validation: Results from Seismic Crosshole and Reflection Measurements, Stage 1 - Stripa Project 88-07, 1988 September Stage 1 Joint Characterization and Stage II Preliminary Prediction Using Small Core Samples - Stripa Project 88-08, 1988 August Site Characterization and Validation: Hydrochemical Investigations in Stage 1 - Stripa Project 88-09, 1988 September Site Characterization and Validation: Drift and Borehole Fracture Data Stage 1 - Stripa Project 88-10, 1988 September Rock Sealing: Interim Report on the Rock Sealing Project (Stage 1) - Stripa Project 88-11, 1988 September Executive Summary of Phase 2 - Stripa Project 89-01, 1989 February Fracture Flow Code Cross Verification Plan - Stripa Project 89-02, 1989 March Site Characterization and Validation Stage 2: Preliminary Predictions - Stripa Project 89-03, 1989 May Site Characterization and Validation : Single Borehole Hydraulic Testing Stage 1 - Stripa Project 89-04, 1989 March Site Characterization and Validation: Monitoring of Head in the Stripa Mine During 1988 - Stripa Project 89-06, 1989 April Annual Report 1988 - Stripa Project 89-05, 1989 May Site Characterization and Validation: Geophysical Single Hole Logging Stage 3 - Stripa Project 89-07, 1989 May Water Flow in Single Rock Joints - Stripa Project 89-08, 1989 May Site Characterization and Validation: Borehole Radar Investigations, Stage 3 - Stripa Project 90-01, 1989 November Quarterly Report, April Through June - Stripa Project, 1990 Site Characterization and Validation: Drift and Borehole Fracture Data, Stage 3 - Stripa Project 90-02, 1990 February High Voltage Microscopy of the Hydration of Cement with Special Respect to the Influence of Superplasticizers - Stripa Project 90-03, 1990 February Preliminary Prediction of Inflow into the D-Holes at the Stripa Mine - Stripa Project 90-04, 1990 February Hydrochemical Investigations within the Stripa Project - Stripa Project 90-05, 1990 August Site Characterization and Validation: Coupled Stress-Flow Testing of Mineralized Joints of 200 mm and 1400 mm Length in the Laboratory and In Situ, Stage 3, 1990 February Prediction of Inflow into the DHoles at the Stripa Mine - Stripa Project 90-06, 1990 April Site Characterization and Validation: Stress Field in the SCV Block and Around the Validation Drift, Stage 3 - Stripa Project 90-09, 1990 April Site Characterization and Validation: Single Borehole Hydraulic Testing of "C" Boreholes, Simulated Drift Experiment and Small Scale Hydraulic Testing, Stage 3 - Stripa Project 90-10, 1990 April Site Characterization and Validation: Measurement of Flowrate, Solute Velocities and Aperture Variation in Natural Fractures as a Function of Normal and Shear Stress, Stage 3 - Stripa Project 90-11, 1990 April Load More