Please note that UNLV may not own the copyright to these materials and cannot provide permission to publish or distribute materials when UNLV is not the copyright holder. The user is solely responsible for determining the copyright status of materials and obtaining permission to use material from the copyright holder and for determining whether any permissions relating to any other rights are necessary for the intended use, and for obtaining all required permissions beyond that allowed by fair use.
Read more about our reproduction and use policy.
I agree.Information
Digital ID
Permalink
Details
More Info
Rights
Digital Provenance
Publisher
Transcription
PUBLIC SERVICE COMMISSION OF NEVADA Carson C i t y , Nevada August 2 0 , 1934., j vv O ITEM FOR THE . PRESS The p u b lic s e r v ic e commission o f r e c e ip t ' of an ap p li c a t io n frora the La V ega Company, f o r a u th o r it y to amend the schedule r e f r i g e r a t i n g or i c e machines and water used through s p r in k le r system s, b o th sch ed u les to October Hi 1 9 3 4 , Nevada I s In Land and Water of w ater r a t e s f o r f o r r o o f c o o lin g become e f f e c t i v e The p re s e n t r a t e s f o r or i c e machines are as f o l l o w s : ton machine or l e s s Between and 1 ton machine f o r each to n over 1 ton c o o lin g w ater f o r r e f r i g e r a t o r I Rate $2.00 2 o50 1.00 The proposed r a t e s f o r t h i s c l a s s of f o l l o w s : (a) Where w ater a f t e r p a ssin g through machine c o l l e c t e d , r e - c o o l e d and r e -u s e d : s e r v ic e a re as Rate Per i s Month ir ton machine or l e s s Between § and 1 ton machine For each ton over 1 ton (b2.00 2 o50 1.00 (b) Where w ater a f t e r p a ssin g through machine i s d isch a rg e d in to sewer or c e s s p o o l or otherw ise w asted, or i s not c o l l e c t e d , r e - c o o l e d and r e -u s e d , b ton machine Between and 1 ton machine Between 1 and 2 ton machine For each ton over 2 tons $10,00 1 5 .0 0 2 5 .0 0 5.00 At th e p r e s e n t time th e r e i s no r a t e in e f f e c t f o r r o o f c o o lin g by s p r in k le r system s. The proposed r a t e i s as fniiowh: For each s p r i n k l e r head $ 2 ,0 0 per month.