Skip to main content

Search the Special Collections and Archives Portal

upr000342 23

Image

File
Download upr000342-023.tif (image/tiff; 23.52 MB)

Information

Digital ID

upr000342-023
    Details

    Rights

    This material is made available to facilitate private study, scholarship, or research. It may be protected by copyright, trademark, privacy, publicity rights, or other interests not owned by UNLV. Users are responsible for determining whether permissions are necessary from rights owners for any intended use and for obtaining all required permissions. Acknowledgement of the UNLV University Libraries is requested. For more information, please see the UNLV Special Collections policies on reproduction and use (https://www.library.unlv.edu/speccol/research_and_services/reproductions) or contact us at special.collections@unlv.edu.

    Digital Provenance

    Digitized materials: physical originals can be viewed in Special Collections and Archives reading room

    Publisher

    University of Nevada, Las Vegas. Libraries

    f Las Vegas Review /ournal-March 6} 1950 Water District 1 Manager to Be j Hired Soon, Said Choice of a general-hianager for the Las Vegas valley water district, is expected to be made within the next week or 10 days, clearing the way for early ac­tion on the various problems fac­ing the board of directors, in j bringing water in from L a k e j Mead. A conference has been sched-1 uled for jj Saturday night with Kenneth Hill,, senior engineer for j the firm of Greeley and Hanson Chicago, consultants, who car­ried on the preliminary studies | for the district, and at that time ; applications for the executive post will be canvassed. As soon as this choice is made, the board plans to proceed a t ; once with negotiations along;] lo u r major lines,' completion o f’ ;which are regarded as vital to! ;the ultimate success of the pro-: ject. These are-: 1. -Purchase of the Las Vegas Land and Water '-company’s! wells and facilities. Officials of the compaify have indicated a i readiness and willingness to en­ter into discussions looking to-; ward ultimate taking over of1 their Las Vegas operation by the' water district and no difficulty is anticipated in this regard.. 2. -Purchase Of the pipe-line and pumping facilities now car­rying water from Lake Mead to Basic plant. The board expects to negotiate with the Nevada Colorado river commission for: this unit, with the understand-! ing that the plant will have first! call on whatever water is nee-* essary -for -ttsr operation. 3. -Completion of an agreement with the air force for supplying the 4,000,000 gallons per day ul­timately needed there. 4. -Contract with the resort ho-, . tels in the “ strip” ’ a.rea for their! I water supply now obtained from wells. Members of the board of direc- : tors are confident they vyill be able to carry through the de­tails Of the program -and ac­tually get under way with con­struction sometime during 1950.