Information
Digital ID
upr000220-028
UNLV Special Collections provides copies of materials to facilitate private study, scholarship, or research. Material not in the public domain may be used according to fair use of copyrighted materials as defined by copyright law. Please cite us.
Please note that UNLV may not own the copyright to these materials and cannot provide permission to publish or distribute materials when UNLV is not the copyright holder. The user is solely responsible for determining the copyright status of materials and obtaining permission to use material from the copyright holder and for determining whether any permissions relating to any other rights are necessary for the intended use, and for obtaining all required permissions beyond that allowed by fair use.
Read more about our reproduction and use policy.
I agree.MEMORANDUM FOR FILE: Los Angeles, June 1, 1951 7334 Well No* 8 pump was started on April 10, 1951, and recorded 4-3/4" of water flowing over 48” weir, or 1,490 gallons per minute. Without pump operation water was flowing a little over 3W over the weir, which would be about 750 gallons per minute* Well No. 10 was started on May 14, 1951, with new 30 HP motor and recorded a flow of 6-1/2* over 48* weir, or 2,340 gallons per minute* Well No. 11 was weired on May 22, 1951, and recorded 5" of water flowing over 48" weir with test pump in operation, or 1,605 gallons per minute* With Porno Without Porno Net Gain Well No. 8 1,490 GPM 750 GPM 740 GPM Well No* 10 2,340 era 1,300 GPM 1,040 GPM Well No* 11* 1.605 GPM 1.035 GPM 570 GPM TOTAL, 5,435 GPM 3,085 GPM 2,350 GPM m 7,826,400 GPD ? 4,442,400 GPD ? 3,384,000 GPD NOTEt (*) Temporary pump installed pending delivery of permanent punrp, delivery of which is premised from factory latter part of August* Permanent pump will produce 1,800 GPM when installed* n R* L. ADAMSON cc-WgJ JUN e 1951 L . C . C .