Skip to main content

Search the Special Collections and Archives Portal

upr000062 22

Image

File
Download upr000062-022.tif (image/tiff; 27.02 MB)

Information

Digital ID

upr000062-022
    Details

    Rights

    This material is made available to facilitate private study, scholarship, or research. It may be protected by copyright, trademark, privacy, publicity rights, or other interests not owned by UNLV. Users are responsible for determining whether permissions are necessary from rights owners for any intended use and for obtaining all required permissions. Acknowledgement of the UNLV University Libraries is requested. For more information, please see the UNLV Special Collections policies on reproduction and use (https://www.library.unlv.edu/speccol/research_and_services/reproductions) or contact us at special.collections@unlv.edu.

    Digital Provenance

    Digitized materials: physical originals can be viewed in Special Collections and Archives reading room

    Publisher

    University of Nevada, Las Vegas. Libraries

    1 0 i# l», Masson l»* 'St ItflURg Industrial Engineer M«t, Industrial Engineer flans B iapreveneate to ana rehabilitation »f now promotion facilities and naJor water Sip eaeteneioae, igeolwing hydraulic ealoSations and preparation of oonatruotioa cost estlMatse. Super­vise installation*# M? H, Johnson ** Sioreteff and Mat# to Manager, Industrial Development Prepare recommendations for esssontive approval# tmt m mm? production facilities and mtm main extensions, check construction contracts aM refund agreements. Handle correspondence, Prepare gjggggg for monthly nsstdag of Board of Directors, M# $. Davis - Seoretaiy faJ» dlotation and all minutes mass uioaaaaon asm type an letters, mimitee, eto, pertaining to above t*orfc performed by w. H, Johnson, I, I* Devi* ? Chief Draftsman Prepare all naps gw two in preparation of contrast# end reooBtaandatloiw and for general tise of operating and aainteriancr foroes. i