Information
Digital ID
upr000062-022
UNLV Special Collections provides copies of materials to facilitate private study, scholarship, or research. Material not in the public domain may be used according to fair use of copyrighted materials as defined by copyright law. Please cite us.
Please note that UNLV may not own the copyright to these materials and cannot provide permission to publish or distribute materials when UNLV is not the copyright holder. The user is solely responsible for determining the copyright status of materials and obtaining permission to use material from the copyright holder and for determining whether any permissions relating to any other rights are necessary for the intended use, and for obtaining all required permissions beyond that allowed by fair use.
Read more about our reproduction and use policy.
I agree.1 0 i# l», Masson l»* 'St ItflURg Industrial Engineer M«t, Industrial Engineer flans B iapreveneate to ana rehabilitation »f now promotion facilities and naJor water Sip eaeteneioae, igeolwing hydraulic ealoSations and preparation of oonatruotioa cost estlMatse. Supervise installation*# M? H, Johnson ** Sioreteff and Mat# to Manager, Industrial Development Prepare recommendations for esssontive approval# tmt m mm? production facilities and mtm main extensions, check construction contracts aM refund agreements. Handle correspondence, Prepare gjggggg for monthly nsstdag of Board of Directors, M# $. Davis - Seoretaiy faJ» dlotation and all minutes mass uioaaaaon asm type an letters, mimitee, eto, pertaining to above t*orfc performed by w. H, Johnson, I, I* Devi* ? Chief Draftsman Prepare all naps gw two in preparation of contrast# end reooBtaandatloiw and for general tise of operating and aainteriancr foroes. i