Skip to main content

Search the Special Collections and Archives Portal

upr000212 77

Image

File
Download upr000212-077.tif (image/tiff; 26.59 MB)

Information

Digital ID

upr000212-077
    Details

    Rights

    This material is made available to facilitate private study, scholarship, or research. It may be protected by copyright, trademark, privacy, publicity rights, or other interests not owned by UNLV. Users are responsible for determining whether permissions are necessary from rights owners for any intended use and for obtaining all required permissions. Acknowledgement of the UNLV University Libraries is requested. For more information, please see the UNLV Special Collections policies on reproduction and use (https://www.library.unlv.edu/speccol/research_and_services/reproductions) or contact us at special.collections@unlv.edu.

    Digital Provenance

    Digitized materials: physical originals can be viewed in Special Collections and Archives reading room

    Publisher

    University of Nevada, Las Vegas. Libraries

    Lae Vegas Install Electric P u m p in Springe and Build 800 foot P o w e r Line. Item Labor Material Total P o l e s $ 100. | 70* i 170. H a r d w a r e and Insulation 25* 25. 50. W i r e 50. 75. 125. M S S 15. 20. 35. Total i 190. # 190. | 380. Pumps with 7.5 H o r s e p o w e r M o t o r 50. 410. 460. * j / -.'V Switc h e s a n d Controls 40. 40. l1o©o 1* Total $ 90. | 450. | 540. # 380. grand Total $ 920. EOfES Power Company advisee h a v e p o w e r available near our property line for three p h a s e 220 volt*