Skip to main content

Search the Special Collections and Archives Portal

upr000120 270

Image

File
Download upr000120-270.tif (image/tiff; 26.75 MB)

Information

Digital ID

upr000120-270
Details

Rights

This material is made available to facilitate private study, scholarship, or research. It may be protected by copyright, trademark, privacy, publicity rights, or other interests not owned by UNLV. Users are responsible for determining whether permissions are necessary from rights owners for any intended use and for obtaining all required permissions. Acknowledgement of the UNLV University Libraries is requested. For more information, please see the UNLV Special Collections policies on reproduction and use (https://www.library.unlv.edu/speccol/research_and_services/reproductions) or contact us at special.collections@unlv.edu.

Digital Provenance

Digitized materials: physical originals can be viewed in Special Collections and Archives reading room

Publisher

University of Nevada, Las Vegas. Libraries

% Corporation, now Atlantic Richfield Company, a Pennsylvania cor­poration, covering license for maintenance and operation of a 6" oil pipeline crossing at Mo P 0 18„46, Old San Pedro Branch, in vicinity of 27th Street and California Avenue, Long Beach, Cali­fornia, be and the same is hereby ratified, approved and confirmedo The following Authority for Expenditure Request, ap­proved by President Bailey, was submitted for ratification: Work Order No0 S-4, issued June 28, 1966; Las Vegas Land and Water Company to deposit $118,000 to cover cost of con­structing 10,500 feet of 12", 14" and 16" water mains to serve approximately 200 acres of industrial property in Handorf Industrial District No. 1, City of Industry, California; construc­tion of water mains to be performed, and owned, by San Gabriel Valley Water Company; deposit to be subject to refund annually at the rate of 22% of the revenue collected from customers over a twenty year period; refund of the unrefunded balance of the actual cost of the water mains to be made when 80% of the customers for which the main extension was designed, are being served® Deposit was assented to by Union Pacific Railroad Company Executive Committee on May 12, 1966: Total estimated expenditure * ® <, o80 eoo $118,000o0Q Difference chargeable to deposits for public utilities service -- subject to refund ».. ... ... ... © © ® © o © $118,000 o 00 -3-