Skip to main content

Search the Special Collections and Archives Portal

upr000001 85

Image

File
Download upr000001-085.tif (image/tiff; 98.7 MB)

Information

Digital ID

upr000001-085
    Details

    Rights

    This material is made available to facilitate private study, scholarship, or research. It may be protected by copyright, trademark, privacy, publicity rights, or other interests not owned by UNLV. Users are responsible for determining whether permissions are necessary from rights owners for any intended use and for obtaining all required permissions. Acknowledgement of the UNLV University Libraries is requested. For more information, please see the UNLV Special Collections policies on reproduction and use (https://www.library.unlv.edu/speccol/research_and_services/reproductions) or contact us at special.collections@unlv.edu.

    Digital Provenance

    Digitized materials: physical originals can be viewed in Special Collections and Archives reading room

    Publisher

    University of Nevada, Las Vegas. Libraries

    (Fo r m 30) Form 39-1 3m—3-16— U j JH %'KK3mX2EZX LOS ANGELES & SALT LAKE RAILROAD COMPANY Los Angeles, California, Oct. 9, 1916* ....JMsMasmiL of. lay... L<4.»D Authority is asked for the expenditure of $..... ..Department Appropriation No ..for^m%im^BA^m%..M...impxmlng. Miff., facllif i#.fL M%.. ..............................................................„............ as shown by plan and detailed estimate attached} the total estimate cost of which, including donation, is apportioned as follows% Cost to Railroad Company Labor Material Total Chargeable to Investment - - - ....X.lMSb Chargeable to Operating Expenses - . ...... Gil Total Cost to Railroad Company - ......11.9.9*64 mz*$i .4.11^11 165.18 ¥m»m Value of Work or Property Donated: Ghargedble to Investment - - - ..—....................................... ............ Chargeable to Operating Expenses - ............................................................ Total Value of Work or Property Donated * - - - ......................................................................... ................... Total Cost or Value of Work - p - - - * - - - - - 4 - ^T92«91S The reason why the above expenditure is recommended: Present watering facilities at Las Vegas are unsetisfaetoiy to care for large shipments occasionally handled at this point. Plan provides for sixteen additional watering troughs and larter water pipes to serve them. Also, tho wood stave tank now at St* Jfaomae and which is not now need at that point, will supply water at a much faster rat© than is now obtained through the long 3’* pipe. Approved as to distribution of charges ApproFt#f Superintendent. (Signed) R. K. BRO WN ^T)OCJ Division Engineer. Engineer of Maintenanoe n- r. /1 Approved: Chief Engineer* mm General Manager. (Signed) H. V. Platt mgneddJ. MOS Special Committee.