Skip to main content

Search the Special Collections and Archives Portal

upr000094 208

Image

File
Download upr000094-208.tif (image/tiff; 26.87 MB)

Information

Digital ID

upr000094-208
Details

Rights

This material is made available to facilitate private study, scholarship, or research. It may be protected by copyright, trademark, privacy, publicity rights, or other interests not owned by UNLV. Users are responsible for determining whether permissions are necessary from rights owners for any intended use and for obtaining all required permissions. Acknowledgement of the UNLV University Libraries is requested. For more information, please see the UNLV Special Collections policies on reproduction and use (https://www.library.unlv.edu/speccol/research_and_services/reproductions) or contact us at special.collections@unlv.edu.

Digital Provenance

Digitized materials: physical originals can be viewed in Special Collections and Archives reading room

Publisher

University of Nevada, Las Vegas. Libraries

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 Section 16. The District agrees that it will, at its sole cost and expense, and within two years from the sale date, commence and thereafter diligently prosecute to completion the ' following work* (a) Construct adequate pipe lines to replace the pipe lines referred to in subparagraph (b) of this section, which are to be removed by the District. In the event the District desires to construct said pipe lines along and across the property of Railroad Companies, the District shall have the right to construct said pipe lines in locations shown by broken red and white lines between points marked A and V, V and K, Y and D, and K and E on said Exhibit “A”. Said pipe lines constructed along and across the property of the Rail­road Companies shall be constructed in accordance with good engineering practice, and the top of said pipe lines shall be at least three (3) feet below the surface of the ground. (b) Remove from the premises of the Railroad Companies the 24-ineh cast iron pipe line between points marked A and E, the 16-ineh transit© and east iron pipe line between points A and K, and the pipe line between points marked R and HH shown in broken red and black lines on said Exhibit nAM and restore the surface of the lands to the condition existing prior to such removal. (c) Remove the pumping station now located at point HH. The District shall have the right to relocate said pumping station in a new location shown in solid green 34.