Information
Digital ID
upr000218-305
UNLV Special Collections provides copies of materials to facilitate private study, scholarship, or research. Material not in the public domain may be used according to fair use of copyrighted materials as defined by copyright law. Please cite us.
Please note that UNLV may not own the copyright to these materials and cannot provide permission to publish or distribute materials when UNLV is not the copyright holder. The user is solely responsible for determining the copyright status of materials and obtaining permission to use material from the copyright holder and for determining whether any permissions relating to any other rights are necessary for the intended use, and for obtaining all required permissions beyond that allowed by fair use.
Read more about our reproduction and use policy.
I agree.. \ 2 Mr. V. W. Smith: Fence: (X) Furnish material for all fence and both labor and material for inside fenoe Well atN o.t r1a1n:sformers. Furnish concrete mat, well casing and well fittings. Settling Basin: Furnish all piping Power Line: Furnish all labor and material New Additional Property: Pipe Lines including valves, meter. Fence: (1) All labor and equipment except Inside fence at transformers. Well No, 11: Drill well. Settling Basin; Construct basin incl. all labor and material except piping. Power Line; Blast holes for power poles. fittings, eto.; 42"“ WC..II..PP.. Lin.« Ft. 6” C.I.P. 8 £« J.I.P. 8 24“ Transite Cl. 100 “ 24" C.I.P. Cl. 150 " 36“ C.I.P. S.H. « Concrete Anchor Blocks Cu. Yd. Valve Boxes per Plan 16179-1 Each Lumber (In valve and meter boxes) MBM 4“ Fire Hydrants Each Hose Reel Boxes * 2&" CRL Fire Hose Lin. Ft. Excavation, Com. Cu. Yd. * Co®. Wet 8 " S. R. * 8 Olay, Wet » £71S9 9346 400.4 10,697.2 s.o 1 1 .7 2. 0.217 66 300 4447£3l l6£l IO51 Contract Cost Pipe Lines $££,060.00