Skip to main content

Search the Special Collections and Archives Portal

upr000204 11

Image

File
Download upr000204-011.tif (image/tiff; 27.02 MB)

Information

Digital ID

upr000204-011
    Details

    Rights

    This material is made available to facilitate private study, scholarship, or research. It may be protected by copyright, trademark, privacy, publicity rights, or other interests not owned by UNLV. Users are responsible for determining whether permissions are necessary from rights owners for any intended use and for obtaining all required permissions. Acknowledgement of the UNLV University Libraries is requested. For more information, please see the UNLV Special Collections policies on reproduction and use (https://www.library.unlv.edu/speccol/research_and_services/reproductions) or contact us at special.collections@unlv.edu.

    Digital Provenance

    Digitized materials: physical originals can be viewed in Special Collections and Archives reading room

    Publisher

    University of Nevada, Las Vegas. Libraries

    Las Vegas* Nevada January 10, 1955 R. L.A. Mr# a E# Bennetts JAN 12 195' With reference to the above entitled application No« 15754, please be advised that Mr* LeRoy Maag and I conferred with Mr* Francis Thorne, local well super­visor of the State Engineer and Mr* H* Winchester, representative of the State Engineer*s office from Carson City, on January 7, 1955* I believe our discussion has now cleared up any confusion in the State Engineer's office between our Since the issuance of our Permit No* 15140 to transfer 2*5 c*f*s* of water, and prior to the filing of our Proof of Commencement of Work under this permit, we filed application No* 15754 transferring 1*4 c*f*s* of water from the location authorized by Permit No* 15140 to a new point of diversion* Application No* 15754 was filed after discussions with Mr* Hugh Shamberger, State Engineer, but apparently he was the only person aware of the procedure which we were following pursuant to our discussions* Because we have now filed our Proof of Commencement of Work under Per-of such permit, and because our conference has clarified this matter for Mr* H* Winchester as well as Mr* Francis Thome, I feel sure that Application No* 15754 will be approved in the very near future and that such approval will authorise the drilling of a well at the new point of diversion described in said application* / I anticipate that we will receive the requested y, 1 authority in the next week or two and I will transmit the same to you at once* Permit No* 15140 and our Application No* 15754* mlt No* 15140, showing compliance with the conditions W. W J, JAN 12 195T CALVIN M* CORY