Skip to main content

Search the Special Collections and Archives Portal

man000163 91

Image

File
Download man000163-091.tif (image/tiff; 36.9 MB)

Information

Digital ID

man000163-091
    Details

    Rights

    This material is made available to facilitate private study, scholarship, or research. It may be protected by copyright, trademark, privacy, publicity rights, or other interests not owned by UNLV. Users are responsible for determining whether permissions are necessary from rights owners for any intended use and for obtaining all required permissions. Acknowledgement of the UNLV University Libraries is requested. For more information, please see the UNLV Special Collections policies on reproduction and use (https://www.library.unlv.edu/speccol/research_and_services/reproductions) or contact us at special.collections@unlv.edu.

    Digital Provenance

    Digitized materials: physical originals can be viewed in Special Collections and Archives reading room

    Publisher

    University of Nevada, Las Vegas. Libraries

    installation of said water main along the lines so staked upon the ground by the Subdivider, and to complete the said installation wit reasonable diligence. Said water main shall consist of Slx inch Cast Iron pipe, 2, To pay to the Subdivider at monthly intervals, fifty percent [50%) of the monthly revenue received by it from customers located within the area outlined in red, as ahovn on the' map hereto attached taking water from the water main so installed hereunder, for a per- K'-JZS' -S'/ iod of ten (10) years from the date of the completion of said in­stallation, or, until the Subdivider has been repaid the actual cos of the line so advanced by it, whichever occurs first. ARTICLE III It is mutually agreed: 1. That the water mains so installed shall be and remain the property of the Company. 2. Should the actual cost of the installation of said water mains exceed the estimated cost of $ 2,020.00________ tnen and in that event the Subdivider will pay the excess to the Company, upon demand, if said actual cost be less than $ 2,020.00___ then the Company will pay to the Subdivider the difference between said estimated cost so advanced and the actual cost. supplies delivered to the job, the cost of all labor employed in connection with the installation of said water main, the cost of premium on contractor’s surety bond, Public Liability, Property Damage and Contractor’s Contractual Liability Insurance, plus ten percent (10%) for supervision and overhead. By actual cost is meant the cost of all material and 3.