Skip to main content

Search the Special Collections and Archives Portal

upr000261 158

Image

File
Download upr000261-158.tif (image/tiff; 27.35 MB)

Information

Digital ID

upr000261-158
    Details

    Rights

    This material is made available to facilitate private study, scholarship, or research. It may be protected by copyright, trademark, privacy, publicity rights, or other interests not owned by UNLV. Users are responsible for determining whether permissions are necessary from rights owners for any intended use and for obtaining all required permissions. Acknowledgement of the UNLV University Libraries is requested. For more information, please see the UNLV Special Collections policies on reproduction and use (https://www.library.unlv.edu/speccol/research_and_services/reproductions) or contact us at special.collections@unlv.edu.

    Digital Provenance

    Digitized materials: physical originals can be viewed in Special Collections and Archives reading room

    Publisher

    University of Nevada, Las Vegas. Libraries

    JAM E S M. M O N T G O M E R Y C O N S U L T IN G E N G IN E E R 15 N O R T H O A K L A N D A V E N U E P A S A D E N A 1, C A L IF O R N IA RYa k 1 - 7 2 9 0 • SYCAMODF 3-7129;. August 30, 1954 Union Pacific Railroad Company 422 West Sixth Street Los Angeles 14, California «_£o0 ATTENTIO M R. ___ _ Attention Mr. Adamson Subject: Las Vegas Valley Water District Gentlemen: Transmitted herewith are the plans and specifications for the main supply line through the Union Pacific property. These and specifications include also the removal of certain exist­ing water mains in accordance with the Agreement between the Railroad and the District. Due to the necessity of getting the work under contract as early as possible in order to permit the line to be placed in operation by next summer, there was insufficient time to coordi­nate all details with the facilities of the various interested parties before advertising for bids. Therefore, while the work is out for bids, we intend to review and coordinate certain details of the work which have not yet been approved by the various interested parties. Any modifications which may be necessary as a result of these further studies will be handled by change order, the amount of which is to be negotiated prior to award of contract. In the very near future we will have plans completed for the other smaller lines which are to be built on the Railroad prop­erty and also for the changes in the power lines. . 1 copy Spec. No. 101 a^4- » 2 sets of plans . 1 copy Spec. No. 2 ? Enclosure W.C. Renshaw, Chief Engineer and Gen. Mgr. Las Vegas Valley Water District