Skip to main content

Search the Special Collections and Archives Portal

upr000161 183

Image

File
Download upr000161-183.tif (image/tiff; 26.45 MB)

Information

Digital ID

upr000161-183
    Details

    Rights

    This material is made available to facilitate private study, scholarship, or research. It may be protected by copyright, trademark, privacy, publicity rights, or other interests not owned by UNLV. Users are responsible for determining whether permissions are necessary from rights owners for any intended use and for obtaining all required permissions. Acknowledgement of the UNLV University Libraries is requested. For more information, please see the UNLV Special Collections policies on reproduction and use (https://www.library.unlv.edu/speccol/research_and_services/reproductions) or contact us at special.collections@unlv.edu.

    Digital Provenance

    Digitized materials: physical originals can be viewed in Special Collections and Archives reading room

    Publisher

    University of Nevada, Las Vegas. Libraries

    \ Co., Inc., covering the construction and laying of 475 feet of 6m cast iron water mains to serve portion of Block 1, Boulder Dam Homesite Addition, Las Vegas, Nevada; consideration $1,722.00, plus actual cost of premium on Surety Bond; be, and the same is hereby, ratified, approved and confirmed. On motion duly seconded, it was RESOLVED, that the action of Vice President Reinhardt in executing lease agreement CLD No. 11541, dated March 3, 1954, with W. A. Nesbitt, an individual, Lessee, covering site for storage of construction equipment and supplies, near California and Hill Streets, Long Beach, Calif., for term beginning February 15, 1954, and extending to February 15, 1959; rental $65 per annum, payable annually in advance; subject to termination by either party upon 30 days* written notice; be, and the same is hereby, ratified, approved and confirmed. Following Authority for Expenditure Requests, approved by the President, were submitted for ratification; A. F. E. No. 1 (W. 0. #774), issued Feb. 2, 1954; Las Vegas, Nevada; constructing 475 ft. of 6n cast iron water main to serve portion of Block 1, Boulder Dam Homesite Addition, Tract No. 1. Total estimated expenditure, $2,850, chargeable to Investment In Water System-Las Vegas, Nev. A. F. E. No. 2 (W. 0. #775), issued Feb. 2, 1954; Las Vegas, Nev.; constructing 3362 ft. of 8n and 3821 ft. of 6n cast iron water mains and 130 ft. of 6n cast Iron fire protection laterals for 9 hydrants and installing pressure reducing valve to serve Twin Lakes Village Unit No. 2 and Blocks 1 and 2 of Heers Subdivision-Nevada No. 1. Total estimated expenditure, $50,331, chargeable to Investment in Water System-Las Vegas, Nev. -6-