Copyright & Fair-use Agreement
UNLV Special Collections provides copies of materials to facilitate private study, scholarship, or research. Material not in the public domain may be used according to fair use of copyrighted materials as defined by copyright law. Please cite us.
Please note that UNLV may not own the copyright to these materials and cannot provide permission to publish or distribute materials when UNLV is not the copyright holder. The user is solely responsible for determining the copyright status of materials and obtaining permission to use material from the copyright holder and for determining whether any permissions relating to any other rights are necessary for the intended use, and for obtaining all required permissions beyond that allowed by fair use.
Read more about our reproduction and use policy.
I agree.Information
Digital ID
Permalink
Details
More Info
Rights
Digital Provenance
Publisher
Transcription
/ V? - 2 - Worl^rder Description Investment Tear Improvements (Continued) W.O. 8577 - Lay 9060 lin. ft. of 24“ cast iron water main from end of present 24“ reservoir outlet to connection with existing 16“ water line in shop grounds, and connect to distributing system. W.C. 684 - Drill new 12“ artesian well 802* deep; lay 1269.2' of 12“ transit pipe from well to settling basin, 1062' of 24“ pipe line from basin to reservoir, and 3646' of 16" pipe line replacing 2826' of 16" and 820' of 24“ redwood stave pipe line; and construct boiler tube fence 48' x 48' square around new well. W.O. 1402 - Benewed 6038 feet of 16“ water line, using cast iron pipe to replace wood stave pipe between reservoir and city connection and extended 1528.9 ft. to new city connection W.O. 1537 - Drill 2 additional wells, recondition one well and make improvements at Middle Spring consisting of retaining wall and cover pipe lines and cleaning out. W.O. 1815 - Drill two wells approximately 500 feet deep including furnishings and well casings 1/ W.O. 2013 - Drill two additional water wells, construct pipe lines and tank, install chlorinator and booster pumps and other facilities. 66 100.73 1942 1943 1944 1/ W.O. 2029 - Drill two additional water wells, construct pipe lines, install additional booster pumping facilities, raise walls of settling basin and install pump on well Ho. 4. 84 148.88 1942 1943 1944 Retirements 2/ Wi.:u«" Retirement of 1265 feet of 10“ and 12“ pipe W.O. 2029) lines undsr W.O.- which were originally installed under W.O. 1537 in 1940. 3 958.10 1944 Total Improvements Total Land Valuation GRAND TOTAL $61 353.02 1929 1930 1931 1941 19 967.89 1936 1937 8 509.54 1939 1940 30 349.77 1940 1941 32 702.97 1941 1942 1943 1J National Defense Projects 2/ Originally installed under W.O. 1537 Amount $60 193.08 1 362.03 60.35 262.44 19 415.89 552.00 8 214.71 294.83 30 458.95 109.18 15 969.81 13 653.66 3 079.50 54 766.16 4 952.75 6 381.82 71 523.19 8 096.92 4 528.77 3 958.10 $412 811.00 34 985.88 $447 796.88