Skip to main content

Search the Special Collections and Archives Portal

upr000113 80

Image

File
Download upr000113-080.tif (image/tiff; 32.65 MB)

Information

Digital ID

upr000113-080
    Details

    Rights

    This material is made available to facilitate private study, scholarship, or research. It may be protected by copyright, trademark, privacy, publicity rights, or other interests not owned by UNLV. Users are responsible for determining whether permissions are necessary from rights owners for any intended use and for obtaining all required permissions. Acknowledgement of the UNLV University Libraries is requested. For more information, please see the UNLV Special Collections policies on reproduction and use (https://www.library.unlv.edu/speccol/research_and_services/reproductions) or contact us at special.collections@unlv.edu.

    Digital Provenance

    Digitized materials: physical originals can be viewed in Special Collections and Archives reading room

    Publisher

    University of Nevada, Las Vegas. Libraries

    mi Detail of Amount of $66,591.30 covering Investment in Water Facilities used joint­ly with the Las Vegas Land and Water Company for the year 1943 and used as a "basis for rendering monthly hills for the year 1944. Description Investment Year Amount Land - Original Construction $24 787.48 - $24 787.48 W.O. 1136 - Purchase 80 acres of land in Sj| of of Section 31-20-61 1 604.80 1937 1 604.80 W.O. 1537 - Purchase 200 acres of additional land at Middle Spring Total Land 8 593.60 1940 8 593.60 Valuation 34 985.88 Improvements W.O. 1053 - Housing over Big Spring and 12" E C pipe 3 837.80 1911 3 837.80 W.O.1965 - Replacing 18" riveted steel pipe line from reservoir to north line of main street with 16" vitrified pipe encased in con-crete and rearranging water line. 7 438.60 1917 9 082.06 1941 . 1 643,46 W.O. 2354 - 4000 Lin. feejt 16" vitrified water pipe line retired and replaced with redwood stave pipe 6 779,09 1918 929.63 1919 5 828.69 1920 20,77 W.O. 2982 - Installing 2600 lin.ft. continuous wood stave pipe replacing equal amount of 16" vitrified pipe installed 1918 6 088.96 1920 6 088.96 W.O. 3747 - Installation of 1372 lin. ft. of 16" cast iron water pipe line through yard, replac-ing 18" wood line 1 080.56 1921 70.60 1922 1 009.96 W.O. 4707 - Drill 12" waterwell (est. 600* deep) lay pipe lines, etc., replacing covering over 2 existing springs, pipe-lines, etc, 6 109.22 1924 6 641.11 1925 531,89 W.O, 5589 - Construct 15* 4"x41*4" concrete settling, "basin with roof: 600' fencing; 40* of 20" wood stave pipe from new well; lay 1816* of 24“ wood stave pipe; lay 1808* of 16" wood stave pipe, etc. 8 267.34 1925 9 411.34 1926 1941 1 63.55 207.55 V.O. 6871 - Install 2 ventilators on roof of shelter over springs 125.44 1926 125.44 W.O. 7392 - Install 16" meter in main serving the L.V.D.& W.Co. 2 042.42 1927 2 042.42 W.O. 7393 - Lay 1306' of 12" Cl water line from Little Spring to settling hasin including one con­crete manhole, install 4* x 7* x 6' con^* Crete form and valve "box and construct roof over spring house 6 010.23 1927 6 010.23 W.O. 8248 - Construct 2,500,000 gallon capacity re­inforced concrete reservoir and 14' x 40* R. C. settling hasin with connecting pipe lines, and install 5001 of 24" C.I. pipe water line 65 856,64 1928 16 205.07 1929 47 401.27 1930 2 250.30