Please note that UNLV may not own the copyright to these materials and cannot provide permission to publish or distribute materials when UNLV is not the copyright holder. The user is solely responsible for determining the copyright status of materials and obtaining permission to use material from the copyright holder and for determining whether any permissions relating to any other rights are necessary for the intended use, and for obtaining all required permissions beyond that allowed by fair use.
Read more about our reproduction and use policy.
I agree.2 0 -6 cc-31-12-4 Mr. F. E. Knickerbocker Your le tte r of February 21st, f i l e 9215-355, regarding approval of a portion of 1928 Budget Item Ko. 68: Your le tt e r states that the approved amount of |71,000, covers estimated cost of the reservoir only. From our detailed estimate supporting original budget item Ko. 68, the amount of $71,000 to Capital Account w ill cover the cost of the construction o f the reservoir with gravel f i l t e r at intake and the replacement of the 2600 f t . of existing 16” pipe with 24” cast iron pipe. Total expenditure $84,430. W ill you kindly advise i f our assumption is correct that budget item as approved, includes a l l of this work or only the reservoir, which we estimate at $56,000. H. L. Adamson