Skip to main content

Search the Special Collections and Archives Portal

upr000332 151

Image

File
Download upr000332-151.tif (image/tiff; 26.25 MB)

Information

Digital ID

upr000332-151
    Details

    Rights

    This material is made available to facilitate private study, scholarship, or research. It may be protected by copyright, trademark, privacy, publicity rights, or other interests not owned by UNLV. Users are responsible for determining whether permissions are necessary from rights owners for any intended use and for obtaining all required permissions. Acknowledgement of the UNLV University Libraries is requested. For more information, please see the UNLV Special Collections policies on reproduction and use (https://www.library.unlv.edu/speccol/research_and_services/reproductions) or contact us at special.collections@unlv.edu.

    Digital Provenance

    Digitized materials: physical originals can be viewed in Special Collections and Archives reading room

    Publisher

    University of Nevada, Las Vegas. Libraries

    PACIFIC TANK. AND PIPE CO. INUATIOX OF LETTER TO S • P. L. A. 8c S • Ij • TiR C 0 DATED May 31—1912 SHEET No. 2 m ortise and tenon jo in t would be rein fo rced with one brass band and bronze shoe on the 25 f t . and 50 f t . head Pipe and two sim ila r bands and shoes on the 75 f t * and 100 f t . head Pipe. A fte r banding, the e n tire outside surface o f the pipe w i l l receive a heavy p ro te c tiv e coating o f asphaltum and w i l l then be r o lle d in sawdust. * FITTING'S & VALVES: F ittin g s w i l l be made o f a good q u a lity o f cast iron and w i l l receive a thorough coating o f asphaltum paint before being shipped from our fa c to ry . The Valve w i l l be the standard Iron Body Brass Mounted type. GUARANTEE: We w i l l guarantee our Pipe, F ittin g s , and Valves against d e fe c tiv e m ateria l, workmanship, and leakage, and when in s ta lle d w i l l withstand the maximum pressures before s p a c ifie d , and w i l l replace at our own expense any p ortion or portion s o f the Pipe, F it t in g s , and Valves ivhich may prove d e fe c tiv e , e ith e r as to m aterial or workmanship performed. This guarantee to cover a period o f one year. DELIVERY: I f favored with your order promptly, we could arrange to commence shipment o f the pipe w ith in t h ir t y days a ft e r re c e ip t o f same, and could complete shipment in approximately twenty days1 time. We would arrange to la y the pipe as fa s t as i t is received at Las Vegas and fig u re that i t would requ ire approxim ately ten days1 time to complete the in s t a lla ­tio n a fte r the la s t car has been received . TERMS: 50$ when shipment o f pipe has been completed] balance 30 days a fte r the completion o f the e n tire in s ta lla tio n . I f p ric e s are desired F.O.B. Los Angeles and la id in place at Las Vegas, under the same conditions as before s p e c ifie d , we w i l l make an allowance o f . . . . 1 6 <p per fo o t from a l l o f the heads s p e c ifie d above. Thanking you very kindly fo r the opportunity to submit fig u re s to you and aw aiting your pleasure in th is matter, we are, Yours tr u ly , PACIFIC TA GTG:SM « * • •