Skip to main content

Search the Special Collections and Archives Portal

upr000264 173

Image

File
Download upr000264-173.tif (image/tiff; 30.78 MB)

Information

Digital ID

upr000264-173
    Details

    Rights

    This material is made available to facilitate private study, scholarship, or research. It may be protected by copyright, trademark, privacy, publicity rights, or other interests not owned by UNLV. Users are responsible for determining whether permissions are necessary from rights owners for any intended use and for obtaining all required permissions. Acknowledgement of the UNLV University Libraries is requested. For more information, please see the UNLV Special Collections policies on reproduction and use (https://www.library.unlv.edu/speccol/research_and_services/reproductions) or contact us at special.collections@unlv.edu.

    Digital Provenance

    Digitized materials: physical originals can be viewed in Special Collections and Archives reading room

    Publisher

    University of Nevada, Las Vegas. Libraries

    1 2 3 41 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 2 S 27 28 29 30 It is agreed that the Owner shall pay th® Contractor for performing his part of the foregoing contract the following price; 116.10 per foot for each foot of well drilled and 3&sed. The above price does not include 20” conductor pipe is to 0e paid for by the .stalled by the Contractu Should the Owner p the w ell, it is agreed m d install pump, and engine to propel same, with a capacity of L,5Q0 gallons per minute with over all length of 200 feet, and run same for a period of twenty four hours for the sum of 1900.00. Should the Owner desire to test Peyona this period he shell pay the Contractor $9*00 per hour for each hour beyond the twenty four aour period. 1he Owner agrees to payment m x u n to the contractor upon completion of well. The Contractor agrees to prosecute the work under this contract diligently and in good and workmanlike manner end further agrees that when well is completed it shall b< snough for the practical Installation ana oprsr&tion of a deep well Purbirte Pump. In Witness Whereof, the parties hereto have executed ,is agreement in duplicate the day and year first above written. LAS VEGAS LAND & WATER COMPANY By_________ ____ ________________ BARBER BRIDGE DRILLING CORPORATION, LTD. By_________________ - 3 -