Information
Digital ID
upr000048-008
UNLV Special Collections provides copies of materials to facilitate private study, scholarship, or research. Material not in the public domain may be used according to fair use of copyrighted materials as defined by copyright law. Please cite us.
Please note that UNLV may not own the copyright to these materials and cannot provide permission to publish or distribute materials when UNLV is not the copyright holder. The user is solely responsible for determining the copyright status of materials and obtaining permission to use material from the copyright holder and for determining whether any permissions relating to any other rights are necessary for the intended use, and for obtaining all required permissions beyond that allowed by fair use.
Read more about our reproduction and use policy.
I agree.File Memo At 4:30AM, Wednesday, May 18th, 1938, weir measurements were taken of entire water supply, from wells and springs. Present were: Walter R. Bracken. 0. D. Baker (City Engineer) C. H. Jameson (assisting Mr. Baker) T. E. Connolly (LVL&WCo) A. M. Folger M Wes Neeley M All valves were closed on transmission mains at the reservoir and measurement at weir disclosed a head of 8.4 inches, which equalled, according to the table 7.52 second feet. By computation, this was equal to 4,859,965 gallons per day amilable for city, railroad company, PFE Co. and stock yards. Mr. C. D. Baker is City and County Engineer and Mr. Jameson is deputy State Water Surveyor and well experienced in taking water measurements through out the State. Las Vegas, May 18, 1938.