Copyright & Fair-use Agreement
UNLV Special Collections provides copies of materials to facilitate private study, scholarship, or research. Material not in the public domain may be used according to fair use of copyrighted materials as defined by copyright law. Please cite us.
Please note that UNLV may not own the copyright to these materials and cannot provide permission to publish or distribute materials when UNLV is not the copyright holder. The user is solely responsible for determining the copyright status of materials and obtaining permission to use material from the copyright holder and for determining whether any permissions relating to any other rights are necessary for the intended use, and for obtaining all required permissions beyond that allowed by fair use.
Read more about our reproduction and use policy.
I agree.Information
Digital ID
Permalink
Details
More Info
Rights
Digital Provenance
Publisher
Transcription
Los Angeles - June 1 3 , 1945 Grig SPA Gy BHP-Omaha A He: APE 20 approved Jan 30, 19^5 for Well No. 11 and pipe line at I#s Vegas, amt $6 5 ,860, and to our subsequent recommendation that program outlined for this eapendlture be changed and extended, requiring additional appropriation. Our authorization for amortization requires work be commenced by Aug 4, 1945. Our WPB approval states QUOTE Unless construction started 70 days from date of issuanoe (which date Is April 11th) the permit is automatically revoked UNQUOTE. This would mean starting by June 20th. However, in another portion of the form it states: QUOTE Expiration Bate: July 3 1 , 1945 UNQUOTE. If we desire to protect these two authorizations I can arrange by contract to excavate ditches for the pipe lines leading from Wells 8 , 9 and 10 to site of proposed settling basin, and place order for the pipe lines. The expense would come well within Authorization of APE 20 and would I believe protect us in WPB and amortization approvals. This program would of course be contingent upon our anticipation project recommended my letter April 2 3 , 19 4 5 , will be approved substantially as proposed. I think this should be given careful consideration; otherwise we should ask for extension of time limit for performance of the work. 3-33 • W H.J. JUN 1 3 1945 FS