Skip to main content

Search the Special Collections and Archives Portal

upr000215 94

Image

File
Download upr000215-094.tif (image/tiff; 23.52 MB)

Information

Digital ID

upr000215-094
    Details

    Rights

    This material is made available to facilitate private study, scholarship, or research. It may be protected by copyright, trademark, privacy, publicity rights, or other interests not owned by UNLV. Users are responsible for determining whether permissions are necessary from rights owners for any intended use and for obtaining all required permissions. Acknowledgement of the UNLV University Libraries is requested. For more information, please see the UNLV Special Collections policies on reproduction and use (https://www.library.unlv.edu/speccol/research_and_services/reproductions) or contact us at special.collections@unlv.edu.

    Digital Provenance

    Digitized materials: physical originals can be viewed in Special Collections and Archives reading room

    Publisher

    University of Nevada, Las Vegas. Libraries

    appreciable slop e, b e lls s h a ll, a t the d is c r e tio n o f the Engineer, fa ce up-grade. No pipe s h a ll be la id in water, or when the trench con ditions or the weather is unsuitable f o r such \vork, ex­cept by permission o f the Engineer. B efore la y in g the pipes, a l l lumps, b lis t e r s , and ex­cess c o a l-ta r coatin g s h a ll be removed from the b e ll-a n d - sp igo t ends o f each pipe; the outside o f the sp igo t and the in sid e o f the b e ll s h a ll then be w ire brushed and wiped clean and dry. Where sulphur compound is s p e c ifie d , o i l and grease a lso s h a ll be removed. Pipe ends s h a ll be kept clean u n til jo in ts are made. Pipe jo in ts s h a ll be sealed w ith sulphur compound ( Tegu l-M in eralcad") , fo llo w in g the preparation o f the jo in t base w ith yarning m ateria l as h e re in a fte r s p e c ifie d . For sulphur compound jo in ts a space not le s s than 2-1/2 inches in depth s h a ll be l e f t in the b e ll in pipe whose nominal diameter is 24 inches or le s s . The jo in t runner s h a ll f i t snugly against the fa c e o f the b e ll and the outside o f the p ip e, and s h a ll be dammed w ith c la y a t the pouring gate to provide fo r f i l l i n g the jo in t even w ith the to p o f the b e ll. Each jo in t s h a ll be made w ith one pour, f i l l i n g the jo in t space. Compound fo r pipe jo in ts s h a ll be fu rnished by Owner. The compound s h a ll be heated in a m eltin g furnace su itab le fo r the use o f sulphur compound and manipulated in accord­ance w ith the in stru ctio n s o f the manufacturer o f the com­pound . I f a jo in t is d e fe c tiv e , i t s h a ll be cut out and e n tir e l y rep laced as d ire c te d by the Engineer. Gate va lves and pipe f it t in g s s h a ll be set and jo in te d to new pipe in the manner h ere to fo re s p e c ifie d fo r clean in g, la y in g , and jo in tin g p ip e. Standard plugs s h a ll be in serted in to the b e lls o f a l l dead ends o f pipes, te e s , or crosses, and sp igo t ends s h a ll be capped. Pressure During Test A fte r the pipe has been la id and p a r t ia lly b a c k fille d a l l newly la id p ip e, or any valved sectio n o f i t s h a ll, un­le s s otherwise s p e c ifie d , be subjected to h yd ro sta tic pres­sure 50 per cent above normal op eratin g pressure. The -3 -