Skip to main content

Search the Special Collections and Archives Portal

man000161 5

Image

File
Download man000161-005.tif (image/tiff; 36.27 MB)

Information

Digital ID

man000161-005
Details

Rights

This material is made available to facilitate private study, scholarship, or research. It may be protected by copyright, trademark, privacy, publicity rights, or other interests not owned by UNLV. Users are responsible for determining whether permissions are necessary from rights owners for any intended use and for obtaining all required permissions. Acknowledgement of the UNLV University Libraries is requested. For more information, please see the UNLV Special Collections policies on reproduction and use (https://www.library.unlv.edu/speccol/research_and_services/reproductions) or contact us at special.collections@unlv.edu.

Digital Provenance

Digitized materials: physical originals can be viewed in Special Collections and Archives reading room

Publisher

University of Nevada, Las Vegas. Libraries

specified in paragraph 1 of Article I hereof and the furnlsh-fittlngs and other materials and upon the arrival of pipe and materials aforesaid at Las Vegas, to proceed with the installation of said water main along the lines so staked u-oon the ground by the Subdivider, and to complete the said installation with reasonable diligence. Said water main shall consist of gf*______ inch Cast Iron pipe. 2. To pay to ths 8ubdivi<l»r at monthly intervals, fifty parcaat (50*) of ths monthly revenue received by it frcan sale of water to the Subdivider for use by the Sunrise Addition School, Youth Town and Armory, from the water main . a-so installed hereunder, for a period of ten (10) years from the date of the ocmpletlon of said installation, or, until the Subdivider has been repaid the actual cost of the line so advanced by it, whichever o« 1 . That the water mains so installed shall be and remain the property of the Company. 2. Should the actual cost of the installation of said then and in that event the Subdivider will pay the excess to the Company, upon demand, if said actual cost be less than ing of such necessary easements, to order the necessary pipe, ARTICLE III. It is mutually agreed: mains exceed the estimated cost of § 2890*00 s 2890.00 , then the Company will pay to the Sub- 3. A-50