Copyright & Fair-use Agreement
UNLV Special Collections provides copies of materials to facilitate private study, scholarship, or research. Material not in the public domain may be used according to fair use of copyrighted materials as defined by copyright law. Please cite us.
Please note that UNLV may not own the copyright to these materials and cannot provide permission to publish or distribute materials when UNLV is not the copyright holder. The user is solely responsible for determining the copyright status of materials and obtaining permission to use material from the copyright holder and for determining whether any permissions relating to any other rights are necessary for the intended use, and for obtaining all required permissions beyond that allowed by fair use.
Read more about our reproduction and use policy.
I agree.Information
Digital ID
Permalink
Details
More Info
Rights
Digital Provenance
Publisher
Transcription
A. Po So No. 15 (W. 0. #680), Issued Aug. 7, 1951; Las Vegas, Nev.; constructing 972 ft. of 6H cast Iron pipe water main in Barnard Drive from connection at Ashby Avenue to Mountain View Boulevard with 50 ft. of 6tt fire protection lateral for fire hydrant to serve Westleigh Tract No. 2. Total estimated expenditure $5090, chargeable to Investment in Water System-Las Vegas, Nevada. A. F. So No. 16 (W. 0. #681), issued Aug. 7, 1951; Las Vegas, Nevada; constructing 275 ft. of 8" cast iron pipe water main in South 15th Street from connection at Wengert Avenue to Sweeney Avenue and 530 ft. of 6” cast iron pipe water main in Sweeney Avenue with 15 ft. of 6n fire protection lateral for fire hydrant. Total estimated expenditure $3070, chargeable to Investment in Water System-Las Vegas, Nevada. A. F. E. No. 17 (W. 0. #682), issued Aug. 7, 1951; Las Vegas, Nev.; constructing 1660 ft. of 6 n cast iron pipe water main from connection in ,?A ” - Street consisting of 787 ft. of 6” pipe in alley between Imperial and Utah Avenues.and 873 ft. of 6” pipe in Industrial Road to Wyoming Avenue with 16 ft. of 6” fire protection lateral for fire hydrant. Total estimated expenditure $5570, chargeable to Investment in Water System-Las Vegas, Nev. A. F 0 E. No. 18 (W. 0. #683), issued Aug. 28, 1951; Las Vegas, Nev.; constructing 200 ft. of 6n cast iron water main extension to water main in 1 alley between Walnut and Mesquite Avenues. Total estimated expenditure, $730, chargeable to Investment in Water System-Las Vegas, Nevada. Whereupon, on motion duly seconded, it was RESOLVED, that the action of President in approving the aforementioned A. F. E. Requests, be, and the same is hereby, ratified, approved and confirmed. There being no further business to be transacted, on motion duly seconded, the meeting adjourned. Attest; (Signed) Wm. Reinhardt__________ (Signed) W. H. Johnson Chairman * I, 1 Secretary ~ I, W. H. Johnson, Secretary of Las Vegas Land and Water Company, do hereby certify, that the foregoing is a full, true and correct copy of minutes of meeting of Board of Directors of said Company, held September 11, 1951. Secretary, Las Vegas Land and Water Company