Skip to main content

Search the Special Collections and Archives Portal

man000205 41

Image

File
Download man000205-041.tif (image/tiff; 26.72 MB)

Information

Digital ID

man000205-041
    Details

    Rights

    This material is made available to facilitate private study, scholarship, or research. It may be protected by copyright, trademark, privacy, publicity rights, or other interests not owned by UNLV. Users are responsible for determining whether permissions are necessary from rights owners for any intended use and for obtaining all required permissions. Acknowledgement of the UNLV University Libraries is requested. For more information, please see the UNLV Special Collections policies on reproduction and use (https://www.library.unlv.edu/speccol/research_and_services/reproductions) or contact us at special.collections@unlv.edu.

    Digital Provenance

    Digitized materials: physical originals can be viewed in Special Collections and Archives reading room

    Publisher

    University of Nevada, Las Vegas. Libraries

    1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 m M m m pip® line into the stain extending along Bonanza Read* la the event the District shall fail to remove the wire lines referred to in subparagraphs (©} and (d) of this section with­in the period above nasmfciGned, the Railroad Companies shall have the right to remove said wire lines and to construct, or arrange with the SOUTHERN NEVADA POWER COMPANY for the construction of, new con* neetions between the existing power facilities of the District and the power lines of the Southern Nevada Power Company $ a© as to pro* vide power for the operation of the water production facilities lo­cated upon the land shown tinted in pink on Exhibit ,!A!\ She Railroad Companies shall have the right to construct such facilities upon the property of the District as shall be nec­essary to connect said new pipe line and new power line connections into the existing facilities of the District. Upon the completion of said work the District shall pay to- the Railroad Companies with­in thirty (30) days after rendition of bill therefor, the actual cost to Railroad Companies and the Southern Nevada Rower Company of removing said pip® lines and wire lime and somtrueting said new pipe line and said new power line connections plus tea percent (10$) of said actual coat of construction representing, the cost of super­vision. 33.