Information
Digital ID
upr000332-097
UNLV Special Collections provides copies of materials to facilitate private study, scholarship, or research. Material not in the public domain may be used according to fair use of copyrighted materials as defined by copyright law. Please cite us.
Please note that UNLV may not own the copyright to these materials and cannot provide permission to publish or distribute materials when UNLV is not the copyright holder. The user is solely responsible for determining the copyright status of materials and obtaining permission to use material from the copyright holder and for determining whether any permissions relating to any other rights are necessary for the intended use, and for obtaining all required permissions beyond that allowed by fair use.
Read more about our reproduction and use policy.
I agree.SUMMARY OF TOT AL COST Off -PROPOS 1 3?I Q I 2 . V'"\' 'pSvTlj With Wood Pipe, Galvanized Wire $>12059,00 With Wood Pipe, Copper Wire 20375,00 With Concrete Pipe 12960,00 P R 0 P 0 S IT I0 1 HO, 5, —***"""- I H— a>—mi 1.1—rnrnmtm To lay pipe lines A. B. C. and F. thereby gathering the total water supply into a permanent pipe system. Since the cost of the copper wound wood pipe is so excessive as compared with concrete pipe, as shown in details proceeding, and since concrete pipe is the more durable, the copper wound pipe is not considered in this estimate of Proposition lo. 3. WOOB STATE,WOXIH) WITH HO 0 G A IiV A IIZ E D W IR E . Bine A. Same as detailed above f 7985,00 line B. 1200 1423 ft. 18” 50 ft. 14” 20 fwt . heTtad. at at 1 .83 #996*00 .66 939.00 1935.00 Line C. 1300 ft. 12” 20 ft. head at 1 .55 715.00 line F. 500 ft. 8” 20 ft. head at # .43i 217.00 Freight on above at .40 per 100 lbs.I.A to 3k)s Vegas 1202.00 Total #12054.00 ( 4. )