Skip to main content

Search the Special Collections and Archives Portal

upr000332 97

Image

File
Download upr000332-097.tif (image/tiff; 26.85 MB)

Information

Digital ID

upr000332-097
    Details

    Rights

    This material is made available to facilitate private study, scholarship, or research. It may be protected by copyright, trademark, privacy, publicity rights, or other interests not owned by UNLV. Users are responsible for determining whether permissions are necessary from rights owners for any intended use and for obtaining all required permissions. Acknowledgement of the UNLV University Libraries is requested. For more information, please see the UNLV Special Collections policies on reproduction and use (https://www.library.unlv.edu/speccol/research_and_services/reproductions) or contact us at special.collections@unlv.edu.

    Digital Provenance

    Digitized materials: physical originals can be viewed in Special Collections and Archives reading room

    Publisher

    University of Nevada, Las Vegas. Libraries

    SUMMARY OF TOT AL COST Off -PROPOS 1 3?I Q I 2 . V'"\' 'pSvTlj With Wood Pipe, Galvanized Wire $>12059,00 With Wood Pipe, Copper Wire 20375,00 With Concrete Pipe 12960,00 P R 0 P 0 S IT I0 1 HO, 5, —***"""- I H— a>—mi 1.1—rnrnmtm To lay pipe lines A. B. C. and F. thereby gathering the total water supply into a permanent pipe system. Since the cost of the copper wound wood pipe is so ex­cessive as compared with concrete pipe, as shown in details proceeding, and since concrete pipe is the more durable, the copper wound pipe is not considered in this estimate of Propo­sition lo. 3. WOOB STATE,WOXIH) WITH HO 0 G A IiV A IIZ E D W IR E . Bine A. Same as detailed above f 7985,00 line B. 1200 1423 ft. 18” 50 ft. 14” 20 fwt . heTtad. at at 1 .83 #996*00 .66 939.00 1935.00 Line C. 1300 ft. 12” 20 ft. head at 1 .55 715.00 line F. 500 ft. 8” 20 ft. head at # .43i 217.00 Freight on above at .40 per 100 lbs.I.A to 3k)s Vegas 1202.00 Total #12054.00 ( 4. )