Information
Digital ID
upr000033-056
UNLV Special Collections provides copies of materials to facilitate private study, scholarship, or research. Material not in the public domain may be used according to fair use of copyrighted materials as defined by copyright law. Please cite us.
Please note that UNLV may not own the copyright to these materials and cannot provide permission to publish or distribute materials when UNLV is not the copyright holder. The user is solely responsible for determining the copyright status of materials and obtaining permission to use material from the copyright holder and for determining whether any permissions relating to any other rights are necessary for the intended use, and for obtaining all required permissions beyond that allowed by fair use.
Read more about our reproduction and use policy.
I agree.V m ? « E, Concrete shall he proportioned as directed by City Inspector. F. The mix shall be kept as dry as possible to work. H Sand and gravel shall be measured. Hi A standard type of batch mixer shall be used. I. Air slacked cement or cement which is lumpy, whatever the cause shall not be used. J. Mixing time not less than Is minutes. K. Forms shall be clean. L. Mechanical vibrators shall be used. M. Reinforcing bars shall be free from scale, oil and structural defects and shall be kept so on the job. N-. All reinforcing shall be in place and firmly wired before concreting starts. Dated: April 26, 1948. 7